Abeto New Energy solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Abeto New Energy solar farm (Planta solar fotovoltaica Abeto New Energy) is a solar photovoltaic (PV) farm in pre-construction in Olite, Navarra, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Abeto New Energy solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Pre-construction[1][2][3] | 75 MWac[3] | PV[3] | Abeto New Energy SLU [100%][3][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Abeto New Energy solar farm
Location | Coordinates (WGS 84) |
---|---|
Olite, Navarra, Aragón, Spain[3] | 42.492738, -1.66686 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240327045948/https://energiaestrategica.es/forestalia-recibe-la-autorizacion-para-13-proyectos-renovables-por-mas-de-600-mw/. Archived from the original on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240329035209/https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-10537. Archived from the original on 29 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 (PDF) https://web.archive.org/web/20240327051611/https://boe.es/boe/dias/2023/08/02/pdfs/BOE-A-2023-17794.pdf. Archived from the original (PDF) on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help)