Acampo Estrén solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Acampo Estrén solar farm (Planta Fotovoltaica Acampo Estrén) is a solar photovoltaic (PV) farm in pre-construction in Zaragoza, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Acampo Estrén solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Pre-construction[1] | 24.9 MWp/dc[2] | PV[3] | Parque Fotovoltaico Estrén SL [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Acampo Estrén solar farm
Location | Coordinates (WGS 84) |
---|---|
Zaragoza, Zaragoza, Aragón, Spain[4] | 41.5468, -0.8604 (approximate)[4] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ http://www.lygeum.es/2022/02/23/presentan-recurso-de-alzada-contra-planta-fotovoltaica-acampo-de-estren/, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E=, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1274684900606, https://www.aragon.es/-/planta-solar-fotovoltaica-acampo-estren-en-el-termino-municipal-de-zaragoza https://www.boa.aragon.es/cgi-bin/INPU/BRSCGI?CMD=VEROBJ&MLKOB=1243210225353, http://www.lygeum.es/2022/02/23/presentan-recurso-de-alzada-contra-planta-fotovoltaica-acampo-de-estren/, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E=, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1274684900606, https://www.aragon.es/-/planta-solar-fotovoltaica-acampo-estren-en-el-termino-municipal-de-zaragoza.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 "Anuncio del Servicio Provincial de Industria, Competitividad y Desarrollo Empresarial de Zaragoza, por el que se somete a información pública la solicitud de Declaración de Utilidad Pública de la instalación de producción de energía eléctrica Planta Solar Foto- voltaica "Acampo Estrén"". Boletín Oficial de Aragón. 2022-10-25. Archived from the original on 2024-02-19.
- ↑ https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E= https://www.boa.aragon.es/cgi-bin/INPU/BRSCGI?CMD=VEROBJ&MLKOB=1243210225353, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E=.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E= http://www.lygeum.es/2022/02/23/presentan-recurso-de-alzada-contra-planta-fotovoltaica-acampo-de-estren/, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VERDOC&BASE=BZHT&PIECE=BOLE&DOCS=1-49&DOCR=20&SEC=BUSQUEDA_FECHA&RNG=200&SEPARADOR=&SECC-C=BOA%20O%20DISPOSICIONES%20O%20PERSONAL%20O%20ACUERDOS%20O%20JUSTICIA%20O%20ANUNCIOS&PUBL-C=20210405&PUBL=&@PUBL-E=.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)