Adams (Coned) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Adams Rose Wind Farm

Adams (Coned) wind farm is an operating wind farm in Mower County, Minnesota, United States.

Project Details

Table 1: Phase-level project details for Adams (Coned) wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2003[1] 14 MW[2] Onshore[2] Consolidated Edison Inc [100%][3] FirstEnergy[4]

Location

Table 2: Phase-level location details for Adams (Coned) wind farm

Phase Name Location Coordinates (WGS 84)
1 Mower County, Minnesota, United States[2] 43.5516, -92.7173 (exact)[2]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210909170321/https://www.coneddev.com/wp-content/uploads/2019/01/Adams-Rose-Wind-MN-Slide-Info-Slide.jpg. Archived from the original on 09 September 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131001343/https://www.thewindpower.net/windfarm_en_7131.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)