Adera Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Adera Solar is an operating solar photovoltaic (PV) farm in Madera County, California, United States.
Project Details
Table 1: Phase-level project details for Adera Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2015[1] | 20 MWac[1] | PV[1] | Sustainable Power Group LLC [100%][2] | AES Distributed Energy[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Adera Solar
Location | Coordinates (WGS 84) |
---|---|
Madera County, California, United States[1] | 37.1206, -120.3249 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20240206193441/https://www.businesswire.com/news/home/20150512005311/en/sPower-Purchases-Solar-Project-from-Solairedirect-26.5MW-in-Madera-County-CA. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)