Adolfo Chaves wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Adolfo Chaves wind farm (Parque Eólico Adolfo Chaves) is a wind farm under construction in Partido de Adolfo Gonzales Chaves, Buenos Aires, Argentina.

Project Details

Table 1: Phase-level project details for Adolfo Chaves wind farm

Status Commissioning year Nameplate capacity Type Owner
Construction[1] 2023 (planned)[2] 100 MW[2] Onshore[2] Tenaris SA [100%][2]

Location

Table 2: Phase-level location details for Adolfo Chaves wind farm

Location Coordinates (WGS 84)
Partido de Adolfo Gonzales Chaves, Buenos Aires, Argentina[2] -38.0315, -60.0993 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126115326/https://infogei.com/nota/38532/comenzara-la-construccion-de-un-parque-eolico-en-adolfo-gonzales-chaves/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240125161212/http://www.acero.org.ar/energias-renovables-tenaris-invertira-us-190-millones-en-un-parque-eolico/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)