Agr Maria solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Agr Maria solar farm is a solar photovoltaic (PV) farm in pre-construction in Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Agr Maria solar farm

Phase name Status Nameplate capacity Technology Operator
Alpha Pre-construction[1] 165.3 MW[1] PV[1] Solaria[1]
Beta Pre-construction[1] 140.1 MW[1] PV[1] Solaria[1]
Delta Pre-construction[1] 228.6 MW[1] PV[1] Solaria[1]
Gamma Pre-construction[1] 140.1 MW[1] PV[1] Solaria[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Agr Maria solar farm

Phase Name Location Coordinates (WGS 84)
Alpha Castilla y León, Spain[1] 41.7693258, -4.219831 (approximate)[1]
Beta Castilla y León, Spain[1] 41.7693258, -4.219831 (approximate)[1]
Delta Castilla y León, Spain[1] 41.7693258, -4.219831 (approximate)[1]
Gamma Castilla y León, Spain[1] 41.7693258, -4.219831 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 https://web.archive.org/web/20240416064237/https://energiaestrategica.es/35-gw-fotovoltaicos-en-tramitacion/. Archived from the original on 16 April 2024. {{cite web}}: Missing or empty |title= (help)