Aire & Calder wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Aire & Calder wind farm is a cancelled wind farm in Humberside, Yorkshire and Humber, England, United Kingdom.

Project Details

Table 1: Phase-level project details for Aire & Calder wind farm

Status Nameplate capacity Type Owner Operator
Cancelled[1] 45 MW[1] Onshore[1] E.ON UK Renewables Ltd [100%][1] E.ON UK Renewables[1]

Location

Table 2: Phase-level location details for Aire & Calder wind farm

Location Coordinates (WGS 84)
Humberside, Yorkshire and Humber, England, United Kingdom[1] 53.6698, -1.0413 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27. {{cite web}}: Check date values in: |date= (help)