Akermendia wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Akermendia wind farm (Parque Eólico Akermendia) is a wind farm in pre-construction in Pueyo, Navarra, Spain.
Project Details
Table 1: Phase-level project details for Akermendia wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 12 MW[2] | Onshore[2] | Enerfin Resources Co [100%][3] | Enerfin Resources[4] |
Location
Table 2: Phase-level location details for Akermendia wind farm
Location | Coordinates (WGS 84) |
---|---|
Pueyo, Navarra, Spain[5] | 42.5656, -1.6483 (approximate)[5] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://gobiernoabierto.navarra.es/es/transparencia/tramite-informacion-publica/parque-eolico-akermendia-modificado-expediente-1191-ce, https://gobiernoabierto.navarra.es/sites/default/files/1.2._separata_para_el_ayuntamiento_de_barasoain_del_parque_eolico_akermendia.pdf, https://gobiernoabierto.navarra.es/es/participacion/procesos/parque-eolico-akermendia-expediente-1191-ce https://bon.navarra.es/es/anuncio/-/texto/2023/35/6, https://gobiernoabierto.navarra.es/es/transparencia/tramite-informacion-publica/parque-eolico-akermendia-modificado-expediente-1191-ce, https://gobiernoabierto.navarra.es/sites/default/files/1.2._separata_para_el_ayuntamiento_de_barasoain_del_parque_eolico_akermendia.pdf, https://gobiernoabierto.navarra.es/es/participacion/procesos/parque-eolico-akermendia-expediente-1191-ce.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 "Parque Eólico "Akermendia" de 12 MW, en términos municipales de Artajona y Barásoain. Expediente: 1191-CE". Gobierno Abierto de Navarra. 2023-02-20. Archived from the original on 2024-02-18. Retrieved 2024-01-15.
{{cite web}}
: Text "Gobierno Abierto de Navarra" ignored (help) - ↑ (PDF) https://web.archive.org/web/20240131144954/https://www.elecnor.com/storage/media/files/shares/Enerfin/informe-anual-integrado-2019-eng.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Parque Eólico "Akermendia", de 24 MW, en término municipal de Pueyo, Artajona y Garinoáin (1191-CE)". Gobierno Abierto de Navarra. 2022-02-15. Archived from the original on 2024-01-26.
- ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240131145715/https://www.elecnor.com/storage/media/files/shares/Enerfin/informe-anual-integrado-2020compressed.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)