Aktobe CHP power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Aktobe CHP power station (Актобе ТЭЦ) is an operating power station of at least 57-megawatts (MW) in Aktobe, Kazakhstan. It is also known as Aktyubinskaya, Aktubinsk.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Aktobe CHP power station | Aktobe, Aktobe, Kazakhstan | 50.336398, 57.140192 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 7: 50.336398, 57.140192
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
7 | Operating[2][3][4][5] | fossil gas: natural gas[6] | 57[6][5] | combined cycle[6][7] | yes[6][8] | 2023[2][8][4][3] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
7 | Aktobe TPP JSC [100%][9][10] | Aktobe TPP JSC [100.0%] |
Background
As of September 2022, construction of the new gas turbine unit was still ongoing, with the delayed planned start date of January 1st, 2023.[11][12] The installed gas turbine is Siemens SGT-800 which is a hydrogen-ready turbine.[11]
The main generation will be provided by the Siemens SGT-800 industrial gas turbine with a 50 MW electrical power generator. The SGT-800 combines a robust design with high efficiency and low emissions. Due to the high energy of the exhaust, this turbine is effectively used in combined cycles.
Exhaust hot gases (fuel combustion products) from the turbine will go to the waste heat boiler manufactured by Podolsk Machine-Building Plant JSC to generate steam with a pressure of 3.0 MPa and a temperature of 420 ° C in a volume of 70 tons per hour. The resulting medium-pressure superheated steam is sent to the existing steam turbines of the Aktobe CHPP for secondary generation of electricity.[13]
Thus, the use of combined cycle technology guarantees combined energy production and maximum fuel efficiency, and also increases the environmental friendliness and efficiency of the power plant.[13]
The commissioning of the gas treatment and fuel supply system for the new gas turbine unit of Aktobe CHPP - installation supervision, commissioning, individual and integrated tests, as well as training of operating personnel is carried out by specialists from ServiceENERGAS (ENERGAS Group), a Russian manufacturer and supplier of process equipment for gas treatment (upstream, midstream) and gas compression.[13] In November 2022, commissioning of the gas turbine began, and the unit was considered officially launched. The total installed capacity of the power station is 175 MW, including smaller units below the GEM's threshold of 50 MW.[14].
Articles and Resources
References
- ↑ https://web.archive.org/web/20210702224457/https://www.industryabout.com/country-territories-3/2030-kazakhstan/fossil-fuels-energy/31017-aktobe-gas-power-plant. Archived from the original on 02 July 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20221118220942/https://ru.sputnik.kz/20221118/na-stantsii-aktobe-tets-zapustili-gazoturbinnuyu-ustanovku-moschnostyu-57-mvt---29469887.html. Archived from the original on 18 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20230116051432/https://www.inform.kz/ru/na-remont-tec-v-aktobe-napravyat-1-4-mlrd-tenge_a4023392. Archived from the original on 16 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20220902135015/https://24.kz/ru/news/economyc/item/562117-v-podderzhku-reform-aktobe-tets-stroit-tsekh-parogazovykh-ustanovok. Archived from the original on 02 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://energybase.ru/news/companies/gas-compressor-units-for-gas-turbine-power-unit-under-construction-were-delivere-2021-03-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20211128024814/https://eabr.org/en/press/news/the-edb-to-finance-construction-of-a-gas-turbine-unit-with-a-waste-heat-boiler-at-the-aktobe-chp-pla/. Archived from the original on 28 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220709174143/https://neftegaz.ru/news/energy/719383-energaz-ustanavlivaet-na-aktobe-tets-kompressornuyu-stantsiyu-toplivnogo-gaza-dlya-novogo-gazoturbin/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210709182846/https://www.korem.kz/details/ndownload.php?fn=6504&lang=rus. Archived from the original on 09 July 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220628132101/https://www.ebrd.com/work-with-us/projects/psd/aktobe-chp-rehabilitation-.html. Archived from the original on 28 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220524193635/http://ar2017.samruk-energy.kz/go/en/012.html. Archived from the original on 24 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 "ЭНЕРГАЗ устанавливает на Актобе ТЭЦ компрессорную станцию топливного газа для нового газотурбинного энергоблока". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ https://web.archive.org/web/20220902135015/https://24.kz/ru/news/economyc/item/562117-v-podderzhku-reform-aktobe-tets-stroit-tsekh-parogazovykh-ustanovok.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 "На Актобе ТЭЦ установлена система комплексной подготовки топливного газа для нового газотурбинного энергоблока". eprussia.ru. 2022-03-14.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "На станции Актобе ТЭЦ запустили газотурбинную установку мощностью 57 МВт". SPUTNIK Казахстан. 11/18/2022. Retrieved 04/21/2023.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.