Al-Ahdab-Tuba Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Al-Ahdab-Tuba Oil Pipeline ،خط أنبوب نفط الاحدب - طوبة is an operating oil pipeline running from Al-Ahdab Oil Field in Wasit Province to Tuba in Al Basra, Iraq.[1][2]

Location

The pipeline runs from Al-Ahdab Oil Field in Wasit Province to Nasiriyah in Dhi Qar governorate, to Tuba in Al Basra, Iraq.[2]

Loading map...

Project details

Pipeline 1 "Al-Ahdab-Nasiriyah"

Loading map...
  • Operator: Midland Oil Company[3]
  • Owner: Iraqi Ministry of Oil[4]
  • Parent company: Iraqi Ministry of Oil[4]
  • Length: 200km[2]
  • Diameter: 24in[2]
  • Status: Operating[2]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Pipeline 1 "Nasiriyah-Tuba"

Loading map...
  • Operator: Midland Oil Company[4]
  • Owner: Iraqi Ministry of Oil[4]
  • Parent company: Iraqi Ministry of Oil[4]
  • Length: 210km[3]
  • Status: Operating[2]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 "بدء ضخ النفط من حقل الأحدب واستئنافه من كركوك".{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "منظومات تصدير النفط العراقي" (PDF).{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 "OPEC Annual Statistic Report, 2017. Page 88" (PDF).{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 "Report of Midland Oil Company" (PDF).{{cite web}}: CS1 maint: url-status (link)