Al-Dur Power and Water Station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Al-Dur Power and Water Station (محطة الدور المستقلة للمياه والطاقة، محطة الدورلإنتاج الكهرباء والمياه) is an operating power station of at least 2726-megawatts (MW) in Al Dur, Southern, Bahrain with multiple units, some of which are not currently operating. It is also known as Al Dur2 IWPP (units 2-1, 2-2).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Al-Dur Power and Water Station | Al Dur, Southern, Bahrain | 25.969278, 50.608007 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1-1, 1-2, 2-1, 2-2, 3: 25.969278, 50.608007
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1-1 | Operating[4] | fossil gas: natural gas[5][4] | 613[5][4] | combined cycle[5] | not found | 2012[4] |
1-2 | Operating[4] | fossil gas: natural gas[5][4] | 613[5][4] | combined cycle[5] | not found | 2012[4] |
2-1 | Operating[6][7][8][9] | fossil gas: natural gas[3][10] | 750[3][9] | combined cycle[7] | not found | 2022[6][7] |
2-2 | Operating[6] | fossil gas: natural gas[11] | 750[11] | combined cycle[6] | not found | 2022[6] |
3 | Pre-construction[12][13] | fossil gas: natural gas[13] | 1800[13] | combined cycle[13] | not found | 2027 (planned)[13] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
1-1 | Al Ezzel Power Company[5] | Engie Energy Services International SA [100%][5] | ENGIE SA [100.0%] |
1-2 | – | – | – |
2-1 | NOMAC[14] | Mitsui & Co Ltd [30%]; ACWA Power Co [60%]; Almoayyed Contracting Group WLL [10%][10][10][10] | ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC |
2-2 | NOMAC[14] | Almoayyed Contracting Group WLL [10%]; ACWA Power Co [60%]; Mitsui & Co Ltd [30%][10][10][10] | ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC |
3 | – | The Electricity and Water Authority[13] | The Electricity and Water Authority |
Project-level captive use details
- Captive industry use (heat or power): power[5]
- Captive industry: Chemicals[5]
- Non-industry use: power[5]
Articles and Resources
References
- ↑ https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18634-al-dur-gas-power-plant.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Al+Dur+2+IWP+Project/@25.9692828,50.6058183,1005m/data=!3m1!1e3!4m5!3m4!1s0x3e4857b5d02b4435:0xc414a55f6395fff1!8m2!3d25.9686337!4d50.6083877.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20210623164923/https://drive.google.com/file/d/1D3ZDtv235TVhW3j7hxEapjMKsoUhlSxy/view. Archived from the original on 2021-06-23.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20220224145415/https://www.ewa.bh/en/AboutUs/AnnualReport/statistics%202018.pdf. Archived from the original (PDF) on 2022-02-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://web.archive.org/web/20211203100044/https://www.powerengineeringint.com/news/bahrain-fighting-fit/. Archived from the original on 2021-12-03.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20220712152949/https://energy-utilities.com/bahrain-s-1-500mw-aldur-2-iwpp-begins-full-news117784.html. Archived from the original on 2022-07-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20221205011038/https://acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-12-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220522210830/https://www.nsenergybusiness.com/projects/al-dur-independent-water-and-power-project-phase-ii/. Archived from the original on 2022-05-22.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20210813171549/https://www.ewa.bh/en/Media/PressReleases/the-minister-of-electricity-affairs-and-the-ceo-inspect-the-second-phase-of-the-al-dur-power-and-water-plant. Archived from the original on 2021-08-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://web.archive.org/web/20220819074905/https://www.acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-08-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20220705115630/https://www.idom.com/en/project/al-dur-ii-iwpp-combined-cycle-power-plant-1500-mw/. Archived from the original on 2022-07-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.saudigulfprojects.com/2023/05/bahrain-announces-aldur-phase-3-iwpp-consultancy-services-bid-prices/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 https://www.zawya.com/en/projects/utilities/bahrain-receives-bids-for-al-dur-phase-3-iwpp-consultancy-tender-pw2gtynn.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 "الرئيسية". nomac-staging.thetribestaging.com. Archived from the original on 2024-03-26. Retrieved 2024-03-25.
{{cite web}}
: Text "المشروع الأول في البحرين، محطة الدور 2، أبرمت نوماك اتفاقية التشغيل والصيانة" ignored (help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.