Al-Dur Power and Water Station (محطة الدور المستقلة للمياه والطاقة، محطة الدورلإنتاج الكهرباء والمياه) is an operating power station of at least 2726-megawatts (MW) in Al Dur, Southern, Bahrain with multiple units, some of which are not currently operating. It is also known as Al Dur2 IWPP (units 2-1, 2-2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Al-Dur Power and Water Station Al Dur, Southern, Bahrain 25.969278, 50.608007 (exact)[1][2][3]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1, 2-2, 3: 25.969278, 50.608007

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Operating[4] fossil gas: natural gas[5][4] 613[5][4] combined cycle[5] not found 2012[4]
1-2 Operating[4] fossil gas: natural gas[5][4] 613[5][4] combined cycle[5] not found 2012[4]
2-1 Operating[6][7][8][9] fossil gas: natural gas[3][10] 750[3][9] combined cycle[7] not found 2022[6][7]
2-2 Operating[6] fossil gas: natural gas[11] 750[11] combined cycle[6] not found 2022[6]
3 Pre-construction[12][13] fossil gas: natural gas[13] 1800[13] combined cycle[13] not found 2027 (planned)[13]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1-1 Al Ezzel Power Company[5] Engie Energy Services International SA [100%][5] ENGIE SA [100.0%]
1-2
2-1 NOMAC[14] Mitsui & Co Ltd [30%]; ACWA Power Co [60%]; Almoayyed Contracting Group WLL [10%][10][10][10] ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC
2-2 NOMAC[14] Almoayyed Contracting Group WLL [10%]; ACWA Power Co [60%]; Mitsui & Co Ltd [30%][10][10][10] ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC
3 The Electricity and Water Authority[13] The Electricity and Water Authority

Project-level captive use details

  • Captive industry use (heat or power): power[5]
  • Captive industry: Chemicals[5]
  • Non-industry use: power[5]


Articles and Resources

References

  1. https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18634-al-dur-gas-power-plant. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/Al+Dur+2+IWP+Project/@25.9692828,50.6058183,1005m/data=!3m1!1e3!4m5!3m4!1s0x3e4857b5d02b4435:0xc414a55f6395fff1!8m2!3d25.9686337!4d50.6083877. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20210623164923/https://drive.google.com/file/d/1D3ZDtv235TVhW3j7hxEapjMKsoUhlSxy/view. Archived from the original on 2021-06-23. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20220224145415/https://www.ewa.bh/en/AboutUs/AnnualReport/statistics%202018.pdf. Archived from the original (PDF) on 2022-02-24. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://web.archive.org/web/20211203100044/https://www.powerengineeringint.com/news/bahrain-fighting-fit/. Archived from the original on 2021-12-03. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20220712152949/https://energy-utilities.com/bahrain-s-1-500mw-aldur-2-iwpp-begins-full-news117784.html. Archived from the original on 2022-07-12. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20221205011038/https://acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-12-05. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20220522210830/https://www.nsenergybusiness.com/projects/al-dur-independent-water-and-power-project-phase-ii/. Archived from the original on 2022-05-22. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20210813171549/https://www.ewa.bh/en/Media/PressReleases/the-minister-of-electricity-affairs-and-the-ceo-inspect-the-second-phase-of-the-al-dur-power-and-water-plant. Archived from the original on 2021-08-13. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 10.6 https://web.archive.org/web/20220819074905/https://www.acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-08-19. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20220705115630/https://www.idom.com/en/project/al-dur-ii-iwpp-combined-cycle-power-plant-1500-mw/. Archived from the original on 2022-07-05. {{cite web}}: Missing or empty |title= (help)
  12. https://www.saudigulfprojects.com/2023/05/bahrain-announces-aldur-phase-3-iwpp-consultancy-services-bid-prices/. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 https://www.zawya.com/en/projects/utilities/bahrain-receives-bids-for-al-dur-phase-3-iwpp-consultancy-tender-pw2gtynn. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 "الرئيسية". nomac-staging.thetribestaging.com. Archived from the original on 2024-03-26. Retrieved 2024-03-25. {{cite web}}: Text "المشروع الأول في البحرين، محطة الدور 2، أبرمت نوماك اتفاقية التشغيل والصيانة" ignored (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.