Al-Khairat-2 power station (محطة كهرباء الخيرات البخارية) is a power station under construction in Khairat, Kerbala, Iraq.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Al-Khairat-2 power station Khairat, Kerbala, Iraq 32.650971, 43.981639 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1-1 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][5][6][3] steam turbine[8] not found
1-2 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
1-3 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
1-4 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
2-1 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
2-2 Construction[4][3][2][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
2-3 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found
2-4 Construction[2][3][4][5][6] fossil liquids: fuel oil[7][3][4][8][9] 350[4][6][3] steam turbine[8] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
1-2 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
1-3 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
1-4 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
2-1 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
2-2 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
2-3 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]
2-4 Ministry of Electricity (Iraq) [100%][6][3] Ministry of Electricity (Iraq) [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[10]
  • Captive industry: Oil & Refining[10]
  • Non-industry use: power[10]


Background

In 2020 Hyundai was chosen to build the second Al-Khairat power plant.[11] In 2021, that decision appeared to change when the Iraq Council of Ministers approved the decision to give the contract to Harlow International Corporation.[12]

Articles and Resources

References

  1. https://web.archive.org/web/20220819210839/https://ashourland.net/2021/02/23/%D8%A7%D9%84%D9%86%D8%A7%D8%A6%D8%A8-%D8%AC%D9%85%D8%A7%D9%84-%D8%A7%D9%84%D9%85%D8%AD%D9%85%D8%AF%D8%A7%D9%88%D9%8A-%D8%A7%D8%AD%D8%A7%D9%84%D8%A9-%D9%85%D8%AD%D8%B7%D8%A9-%D9%83%D9%87%D8%B1%D8%A8/. Archived from the original on 19 August 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20240528183548/https://www.iraq-businessnews.com/2024/04/10/cabinet-approves-debt-guarantees-for-al-khairat-power-station/. Archived from the original on 28 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 https://web.archive.org/web/20220709091250/https://www.mubasher.info/news/3893980/%D8%AD%D9%83%D9%88%D9%85%D8%A9-%D8%A7%D9%84%D8%B9%D8%B1%D8%A7%D9%82-%D8%AA-%D9%82%D8%B1-%D8%AA%D9%88%D8%B5%D9%8A%D8%A9-%D9%88%D8%A5%D8%AC%D8%B1%D8%A7%D8%A1%D8%A7%D8%AA-%D8%AC%D8%AF%D9%8A%D8%AF%D8%A9-%D8%A8%D8%B4%D8%A3%D9%86-%D9%85%D8%B4%D8%B1%D9%88%D8%B9-%D9%85%D8%AD%D8%B7%D8%A9-%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-%D8%A7%D9%84%D8%AE%D9%8A%D8%B1%D8%A7%D8%AA-%D8%A7%D9%84%D8%A8%D8%AE%D8%A7%D8%B1%D9%8A%D8%A9/. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 https://web.archive.org/web/20221006090624/https://www.iraq-businessnews.com/2021/11/01/citic-construction-wins-3-7bn-iraq-power-deal/. Archived from the original on 06 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://www.bncnetwork.net/project/MOE-Al-Khairat-Power-Plant/MTg1NDQ4/. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 https://www.alsumaria.tv/news/localnews/437168/%D9%85%D8%B1%D8%A7%D9%82%D8%A8%D9%88%D9%86-%D9%8A%D8%B7%D8%A7%D9%84%D8%A8%D9%88%D9%86-%D8%B1%D8%A6%D9%8A%D8%B3-%D8%A7%D9%84%D9%86%D8%B2%D8%A7%D9%87%D8%A9-%D8%A7%D9%84%D8%AC%D8%AF%D9%8A%D8%AF-%D8%A8%D8%A7%D9%84%D8%AA%D8%AD%D9%82%D9%8A%D9%82-%D9%81%D9%8A-%D9%85%D8%B4. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://harlowinternational.com/ar/constructiondetails/al-khairat-thermal. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 https://web.archive.org/web/20230116064734/https://www.enerdata.net/publications/daily-energy-news/chinas-citic-group-will-build-and-operate-32-gw-oil-fired-project-iraq.html. Archived from the original on 16 January 2023. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 https://web.archive.org/web/20240528183802/https://energy-utilities.com/chinese-firm-wins-iraq-power-plant-contract-news114677.html. Archived from the original on 28 May 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://web.archive.org/web/20221207123548/https://www.iraq-businessnews.com/2020/07/30/hyundai-to-build-al-khairat-power-station/. Archived from the original on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  11. Hyundai to Build Al-Khairat Power Station, Iraq Business News, Jul 30, 2020
  12. A consortium led by Iraqi-owned Harlow International is expected to implement the project, Power Technology, Feb 26, 2021