Al-Mujib Dam Pumped Storage hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Al-Mujib Dam Pumped Storage hydroelectric plant is a hydroelectric power plant in pre-construction in Dieban Sub-District, Dieban District, Madaba, Jordan.
Project Details
Table 1: Project details for Al-Mujib Dam Pumped Storage hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type |
---|---|---|---|
Pre-construction[1] | 2030 (planned)[2] | 450 MW[1] | Pumped storage[1] |
Location
Table 2: Location details for Al-Mujib Dam Pumped Storage hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Dieban Sub-District, Dieban District, Madaba, Jordan[2][3] | 31.4448, 35.8177 (exact)[2][3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://mitigation-action.org/projects/jordan-pumped-hydro-energy-storage/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://www.zawya.com/en/projects/utilities/jordan-to-establish-pumped-storage-project-before-2030-lwavsoi0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://maps.app.goo.gl/YguYRXiVLndcnjsg6.
{{cite web}}
: Missing or empty|title=
(help)