Al Diwaniyah solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Diwania solar plant
Al Diwaniyah solar farm (محطة الديوانية للطاقة الشمسية) is a solar photovoltaic (PV) farm under construction in Al Diwaniyah, Al-Qadisiyyah Governorate, Iraq.
Project Details
Table 1: Phase-level project details for Al Diwaniyah solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2027 (planned)[2] | 50 MWp/dc[3] | PV[4] | Al Bilal Group; Orascom Construction Industries SAE (OCI); Scatec ASA (سكاتك)[5] | Al Bilal Group; Orascom Construction Industries SAE (OCI); Scatec (سكاتك)[5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Al Diwaniyah solar farm
Location | Coordinates (WGS 84) |
---|---|
Al Diwaniyah, Al-Qadisiyyah Governorate, Iraq[6] | 31.9481, 44.8918 (approximate)[6] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html https://almaalomah.me/news/local/%D8%A7%D9%84%D8%B9%D8%B1%D8%A7%D9%82-%D9%8A%D8%B3%D8%AA%D8%B9%D8%AF-%D9%84%D8%A5%D8%AF%D8%AE%D8%A7%D9%84-%D8%A3%D8%B1%D8%A8%D8%B9-%D9%85%D8%AD%D8%B7%D8%A7%D8%AA-%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%84%D9%84%D8%AE%D8%AF%D9%85%D8%A9-%D9%82%D8%B1%D9%8A%D8%A8%D8%A7, https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.power-technology.com/marketdata/power-plant-profile-al-diwania-solar-pv-park-iraq/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201113608/https://iraqenergy.org/2020/02/20/overview-of-iraqs-renewable-energy-progress-in-2019/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.pv-magazine.com/2019/05/03/iraq-kicks-off-huge-755-mw-solar-tender/ https://attaqa.net/2021/04/07/%D8%A7%D9%84%D8%B9%D8%B1%D8%A7%D9%82-%D9%8A%D8%A8%D8%AF%D8%A3-%D8%AA%D9%86%D9%81%D9%8A%D8%B0-%D9%85%D8%B4%D8%B1%D8%B9%D8%A7%D8%AA-%D8%B7%D8%A7%D9%82%D8%A9-%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%81%D9%8A-5/, https://www.pv-magazine.com/2019/05/03/iraq-kicks-off-huge-755-mw-solar-tender/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html, https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html, https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html, https://energy-utilities.com/consortium-signs-contracts-to-develop-525mw-of-news114644.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240207110726/https://www.pv-magazine.com/2019/05/03/iraq-kicks-off-huge-755-mw-solar-tender/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help)