Al Henakiyah 2 solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Al Henakiyah 2 solar farm is a solar photovoltaic (PV) farm in pre-construction in Medina, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Al Henakiyah 2 solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[1] | 400 MWac[2] | PV[3] | SPIC Huanghe Hydropower Development Co Ltd; EDF Renewables (法國電力再生能源公司)[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Al Henakiyah 2 solar farm
Location | Coordinates (WGS 84) |
---|---|
Medina, Saudi Arabia[5] | 24.9081, 40.5307 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.pv-magazine.com/2024/12/06/edf-renewables-spic-win-1-4-gw-of-solar-projects-in-saudi-arabia/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.pv-magazine.com/2024/02/13/saudi-arabia-reveals-bidders-for-3-7-gw-solar-tender/?utm_source=Global+%7C+Newsletter&utm_campaign=c8ef5f68f3-dailynl_gl&utm_medium=email&utm_term=0_6916ce32b6-c8ef5f68f3-160200263.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Saudi Arabia Announces Multi-Billion Dollar Greenfield Solar Projects". www.blackridgeresearch.com. Archived from the original on 2024-07-16. Retrieved 2024-07-12.
- ↑ https://www.pv-magazine.com/2024/12/06/edf-renewables-spic-win-1-4-gw-of-solar-projects-in-saudi-arabia/ https://www.pv-magazine.com/2024/12/06/edf-renewables-spic-win-1-4-gw-of-solar-projects-in-saudi-arabia/, https://www.pv-magazine.com/2024/12/06/edf-renewables-spic-win-1-4-gw-of-solar-projects-in-saudi-arabia/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.pv-magazine.com/2024/02/13/saudi-arabia-reveals-bidders-for-3-7-gw-solar-tender/?utm_source=Global+%7C+Newsletter&utm_campaign=c8ef5f68f3-dailynl_gl&utm_medium=email&utm_term=0_6916ce32b6-c8ef5f68f3-160200263 https://maps.app.goo.gl/Hpkta4fsjoKp2NKFA, https://www.pv-magazine.com/2024/02/13/saudi-arabia-reveals-bidders-for-3-7-gw-solar-tender/?utm_source=Global+%7C+Newsletter&utm_campaign=c8ef5f68f3-dailynl_gl&utm_medium=email&utm_term=0_6916ce32b6-c8ef5f68f3-160200263.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)