Al Kahfah solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Al Kahfah solar farm (محطة الكهفة للطاقة الشمسية) is a solar photovoltaic (PV) farm in pre-construction in Al Kahafah, Eastern Province, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Al Kahfah solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[2] | 1425 MW[2] | PV[2] | Water and Electricity Holding CO (Badeel) [49%]; ACWA Power Co [50%][3] | ACWA Power[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Al Kahfah solar farm
Location | Coordinates (WGS 84) |
---|---|
Al Kahafah, Eastern Province, Saudi Arabia[4] | 27.0652, 43.0258 (approximate)[4] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240201135410/https://attaqa.net/2023/05/21/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D9%81%D8%B0-3-%D9%85%D8%B4%D8%B1%D9%88%D8%B9%D8%A7%D8%AA-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240724174055/https://acwapower.com/media/342173/acwa-power-1q-2024-investor-report-eng_v9plusfs.pdf. Archived from the original (PDF) on 2024-07-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://enerdatics.com/blog/acwa-power-secures-billion-saudi-projects/, https://solarquarter.com/2024/02/21/al-kahfah-solar-power-project-advancing-saudi-arabias-renewable-energy-goals-with-cutting-edge-technology-and-strategic-partnerships/, https://enerdatics.com/blog/acwa-power-secures-billion-saudi-projects/ https://attaqa.net/2023/05/21/%D8%A3%D9%83%D9%88%D8%A7-%D8%A8%D8%A7%D9%88%D8%B1-%D8%AA%D9%86%D9%81%D8%B0-3-%D9%85%D8%B4%D8%B1%D9%88%D8%B9%D8%A7%D8%AA-%D9%84%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9/, https://enerdatics.com/blog/acwa-power-secures-billion-saudi-projects/, https://solarquarter.com/2024/02/21/al-kahfah-solar-power-project-advancing-saudi-arabias-renewable-energy-goals-with-cutting-edge-technology-and-strategic-partnerships/, https://enerdatics.com/blog/acwa-power-secures-billion-saudi-projects/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.google.com/maps/place/%D9%85%D8%AD%D8%B7%D8%A9+%D8%A7%D9%84%D9%83%D9%87%D9%81%D8%A9%E2%80%AD/@27.0653495,43.0259507,15.69z/data=!4m6!3m5!1s0x15785b561990da3d:0x9cf463942918c05a!8m2!3d27.0652864!4d43.0253128!16s%2Fg%2F11cs251y7k?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help)