Al Shagaya Solar Energy Park

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Dibdibah PV (Phases 2-1, 2-2, 2-3, 2-4, 2-5, 3-CSP), Al-Shagaya Solar (Phase 1-PV), Al Shakaaya Solar (Phase 1-PV), Al Shakaaya Solar II PV 3 (Phase 3-PV), Shagaya Renewable Energy Park Phase 1 (Phase 1-PV), Shagaya New (Phase 1-CSP), Al Shakaaya Solar II PV 2 (Phases 2-1, 2-2, 2-3, 2-4, 2-5, 3-CSP), Al-Dabdaba PV (Phases 2-1, 2-2, 2-3, 2-4, 2-5, 3-CSP), Al-Shegaya Solar (Phase 1-PV)

Al Shagaya Solar Energy Park (مجمع الشقايا للطاقات المتجددة, محطة الدبدبة للطاقة الشمسية) is an operating solar photovoltaic (PV) and solar thermal farm in Shagaya Renewable Energy Park, Kuwait.

Project Details

Table 1: Phase-level project details for Al Shagaya Solar Energy Park

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 2027 (planned)[2] 1100 MWac[3] PV[4] Kuwait Authority for Partnership Projects [100%] (هيئة مشروعات الشراكه)[5]
2 Pre-construction[6] 2028 (planned)[6] 200 MWac[3] Solar Thermal[7] Kuwait Authority for Partnership Projects [100%] (هيئة مشروعات الشراكه)[8]
3 Announced[9] 2028 (planned)[6] 1500 MWac[6] Assumed PV[10] Kuwait Authority for Partnership Projects [100%] (هيئة مشروعات الشراكه)[8]
4 Announced[6] 2028 (planned)[3] 1700 MWac[6] Assumed PV[10] Kuwait Authority for Partnership Projects (هيئة مشروعات الشراكه)[8]
Pilot-CSP Operating[11] 2019[3] 50 MWac[11] Solar Thermal[11] Kuwait Institute for Scientific Research [100%] (معهد الكويت للأبحاث العلمية)[12] TSK[12]
Pilot-PV Operating[13] 2018[3] 10 MWac[14] PV[14] Kuwait Institute for Scientific Research [100%] (معهد الكويت للأبحاث العلمية)[15]

More information on this solar thermal project can be found at csp.guru.

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Al Shagaya Solar Energy Park

Phase Name Location Coordinates (WGS 84)
1 Shagaya Renewable Energy Park, Kuwait[16] 29.2285, 47.0624 (exact)[16]
2 Shagaya Renewable Energy Park, Kuwait[17] 29.2025, 47.0708 (approximate)[17]
3 Shagaya Renewable Energy Park, Al-Jahra Governate, Kuwait[18] 29.2025, 47.0708 (approximate)[18]
4 Al-Jahra Governate, Kuwait[19] 29.1907, 47.0573 (exact)[19]
Pilot-CSP Jahra, Kuwait[20] 29.1987, 47.0465 (exact)[20]
Pilot-PV Shagaya Renewable Energy Park, Kuwait[17] 29.2055, 47.0524 (exact)[17]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://energy-utilities.com/kuwait-invites-consultants-to-bid-for-major-news112410.html https://www.pv-magazine.com/2024/01/04/kuwait-tenders-1-1-gw-solar-project/, https://energy-utilities.com/kuwait-invites-consultants-to-bid-for-major-news112410.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://www.aljarida.com/ext/articles/print/1618413645249845100/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://www.aljarida.com/ext/articles/print/1618413645249845100/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 "Kuwait to launch RFQ for $3.9bln Shaghaya solar power project in 2-3 months – Ministry Official". www.zawya.com. Archived from the original on 2024-07-25. Retrieved 2024-07-17.
  4. https://web.archive.org/web/20220325212018/https://www.aljarida.com/ext/articles/print/1618413645249845100/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://web.archive.org/web/20220325212018/https://www.aljarida.com/ext/articles/print/1618413645249845100/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. https://web.archive.org/web/20240206190731/https://energy-utilities.com/kuwait-to-procure-1-5gw-dibdibah-solar-scheme-as-news084229.html. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://www.solarpaces.org/kuwaits-rfp-for-200-mw-of-csp-has-begun/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://www.solarpaces.org/kuwaits-rfp-for-200-mw-of-csp-has-begun/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  7. https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy https://aip.scitation.org/doi/pdf/10.1063/1.5117583, https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20240201125720/https://www.scpd.gov.kw/Default23.aspx?id=43. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240201125714/https://www.aljarida.com/articles/1618413645249845100. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://www.agbi.com/renewable-energy/2023/10/kuwait-to-resurrect-renewable-energy-mega-project/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://www.agbi.com/renewable-energy/2023/10/kuwait-to-resurrect-renewable-energy-mega-project/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://www.kisr.edu.kw/en/gi/5/details/ https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy, https://www.kisr.edu.kw/en/gi/5/details/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  12. 12.0 12.1 "CSP guru". 2023-07. Archived from the original on 2024-03-11. Retrieved 2024-02-28. {{cite web}}: Check date values in: |date= (help)
  13. https://web.archive.org/web/20240207152319/https://www.kisr.edu.kw/ar/gi/3/details/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy https://www.kisr.edu.kw/en/news/162/details/, https://www.zawya.com/en/projects/utilities/kuwait-to-launch-rfq-for-39bln-shaghaya-solar-power-project-in-2-3-months-ministry-official-cmi3ltuy. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  15. https://www.kisr.edu.kw/en/gi/5/details/ http://arabic.news.cn/2019-02/20/c_137837535.htm, https://www.kisr.edu.kw/en/gi/5/details/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  16. 16.0 16.1 https://web.archive.org/web/20210813204453/https://www.google.com/maps/place/Shagaya+Renewable+Energy+Park/@29.2282996,47.0602265,754m/data=!3m2!1e3!4b1!4m5!3m4!1s0x3fda9956dad7a285:0x99f3c42284eada49!8m2!3d29.2282996!4d47.0624152?shorturl=1. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 17.2 17.3 (PDF) https://web.archive.org/web/20240201130111/https://pubs.aip.org/aip/acp/article-pdf/doi/10.1063/1.5117583/14190340/040003_1_online.pdf. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  18. 18.0 18.1 https://www.pv-magazine.com/2024/01/04/kuwait-tenders-1-1-gw-solar-project/ https://aip.scitation.org/doi/pdf/10.1063/1.5117583, https://www.pv-magazine.com/2024/01/04/kuwait-tenders-1-1-gw-solar-project/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  19. 19.0 19.1 https://maps.app.goo.gl/N3xqbYrfs1M6NaaW9 https://www.pv-magazine.com/2024/01/04/kuwait-tenders-1-1-gw-solar-project/, https://maps.app.goo.gl/N3xqbYrfs1M6NaaW9. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  20. 20.0 20.1 https://web.archive.org/web/20221130183123/https://www.google.com/maps/place/SHAGAYA+RENEWABLE+ENERGY+PARK+-+CSP+50MW/@29.1981017,47.0449674,1228m/data=!3m1!1e3!4m5!3m4!1s0x0:0xb5ce8b1f8a4feefc!8m2!3d29.1986818!4d47.0465144?shorturl=1. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)