AlaTenn Gas Pipeline is an operating natural gas pipeline.[1]

Location

The pipeline runs from Selmer, Tennessee to Huntsville, Alabama.[2]

Loading map...

Project Details

  • Operator: BBT AlaTenn LLC
  • Owner: Black bear transmission llc[3]
  • Parent company: Basalt Infrastructure Partners[3]
  • Current capacity: 200 Million cubic feet per day[4]
  • Proposed capacity:
  • Length: 295 miles / 475 km
  • Diameter: 16 inches[4]
  • Status: Operating
  • Start Year: 2002

Background

The pipeline extends from a point of connection with Tennessee Gas Pipeline Company in McNairy County, Tennessee, through the northeast corner of Mississippi and the northern part of Alabama to Morgan and Madison Counties, Alabama.[5]

In November 2017 a new connection was completed between the AlaTenn pipeline and Southern Gas in Alabama that will enable it to deliver additional Northeast Marcellus gas to the southeast.[6]

The AlaTenn Gas Pipeline was owned and operated by Third Coast Midstream, formerly American Midstream.[7] In September 2020, Black Bear Transmission LLC announced its acquisition of Third Coast's natural gas assets in Alabama, Louisiana and Mississippi. The assets included six intrastate natural gas pipelines spanning approximately 1,400 miles with a total capacity of 800 Mmcf/day.[3]

In July 2023, AlaTenn pipeline system (now BBT AlaTenn) started delivering natural gas supply for commissioning three new power plant units owned and operated by the Tennessee Valley Authority in Colbert County, Alabama.[8][9]

Expansion Projects

Alabama Compressor Station Upgrade

The upgrade will increase natural gas compression on the AlaTenn pipeline, increasing deliveries to Alabama. Flow through the compressor will increase from 59 million cubic feet per day (MMcf/d) to 97 million cubic feet per day (MMcf/d). The upgrade does not include adding any additional miles of pipeline.[10]

  • Operator: BBT AlaTenn LLC
  • Owner: Black bear transmission llc[3]
  • Parent company: Basalt Infrastructure Partners[3]
  • Capacity: 39 million cubic feet per day (MMcf/d)[10]
  • Length: 0.0 new kilometers[10]
  • Cost: US$5 million[10]
  • Status: Construction[10]
  • Start Year: 2020[10]

Articles and resources

References

  1. Enbridge AlaTenn Gas Pipeline, Wikipedia, accessed September 2017
  2. Company Overview of American Midstream (Alatenn), LLC, Bloomberg, accessed January 2018
  3. 3.0 3.1 3.2 3.3 3.4 "Black Bear Transmission Closes Bolt-on Acquisition of Natural Gas Transmission Assets from Third Coast Midstream". Business Wire. 09 September, 2020. Retrieved 24 August, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 "Natural Gas Transmission | Black Bear Transmission LLC". Black Bear LLC. Retrieved 2023-08-24.
  5. FERC NGA Gas Tariffs - Historical, FERC, accessed January 2018
  6. American Midstream Begins Service at AlaTenn Pipeline Connection, Pipeline & Gas Journal, Nov. 6, 2017
  7. AlaTenn Transmission, American Mistream, accessed January 2018.
  8. "Black Bear Transmission Begins Natural Gas Delivery to New Power Plant Units". Black Bear LLC. 2023-07-25. Retrieved 2023-08-24.
  9. "Black Bear Delivers Natural Gas to New Power Plant Units at Retired Alabama Coal Site". EnergyTech. 27 July, 2023. Retrieved 24 August, 2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 Natural Gas Data, Pipeline Projects Energy Information Agency, accessed August 24, 2023

Related GEM.wiki articles

External resources

External articles

Wikipedia also has an article on AlaTenn Gas Pipeline (Enbridge AlaTenn Gas Pipeline). This article may use content from the Wikipedia article under the terms of the Creative Commons Attribution-ShareAlike 3.0 Unported License].