Albesti wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cee Albesti, Vutcani Extension

Albesti wind farm is an operating wind farm in Albesti, Vaslui, Western Moldavia, Romania.

Project Details

Table 1: Phase-level project details for Albesti wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2013[1] 28 MW[1] Onshore[2] SC Sibioara Wind Farm SRL [100%][3] EDP Renováveis[4]

Location

Table 2: Phase-level location details for Albesti wind farm

Phase Name Location Coordinates (WGS 84)
1 Albesti, Vaslui, Western Moldavia, Romania[2] 46.5006, 27.856 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240126040020/https://rnvgroup.com/res-development/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240126110530/https://www.thewindpower.net/windfarm_en_20275_albesti.php. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210909191127/https://www.transelectrica.ro/documents/10179/45094/7productie16.xls/8cac352d-676a-4fbb-9f11-30e8d56a1d4d. Archived from the original on 09 September 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131073206/https://www.thewindpower.net/windfarm_en_20275.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)