Alder hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Alder hydroelectric plant is an operating hydroelectric power plant in Pierce County, Washington, United States.
Project Details
Table 1: Project details for Alder hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1][2] | 1945[1][2] | 50 MW[2] | 2 x 25 MW[1] | Conventional storage[1] | City of Tacoma (WA)[3] | City of Tacoma (WA)[1] |
Location
Table 2: Location details for Alder hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Pierce County, Washington, United States[1][2] | Nisqually River[1][3] | 46.8016, -122.3102 (exact)[1][2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.eia.gov/electricity/data/eia860m/xls/september_generator2024.xlsx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20230221170108/https://www.wri.org/research/global-database-power-plants. Archived from the original on 2023-02-21.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://lowimpacthydro.org/lihi-certificate-8-nisqually-project-washington/.
{{cite web}}
: Missing or empty|title=
(help)