Alfredo Elías Ayub hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Alfredo Elías Ayub hydroelectric plant (Central Hidroeléctrica Alfredo Elías Ayub) is an operating hydroelectric power plant in La Yesca, Nayarit, Mexico.

Project Details

Table 1: Project details for Alfredo Elías Ayub hydroelectric plant

Status Commissioning year Nameplate capacity Technology type Owner Operator
Operating[1] 2012[2] 750 MW[1] Conventional storage[2] Comisión Federal de Electricidad (CFE)[1] Comisión Federal de Electricidad (CFE)[1]

Location

Table 2: Location details for Alfredo Elías Ayub hydroelectric plant

Location River Coordinates (WGS 84)
La Yesca, Nayarit, Mexico[1] Río Grande de Santiago[2] 21.1978, -104.105 (exact)[1]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20220624232535/https://base.energia.gob.mx/nacei/Archivos/3%20P%C3%A1gina%20Datos%20de%20Infraestructura/Ingl%C3%A9s/PowerPlantsAllGE100MW_NorthAmerica_201606.xlsx. Archived from the original on 24 June 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20220624233545/https://lugaresquever.com/wiki/presa-la-yesca. Archived from the original on 24 June 2022. {{cite web}}: Missing or empty |title= (help)