Algerian Qatari Steel Jijel plant (الجزائرية القطرية للصلب (Arabic)), also known as AQS, is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in El-Milia, Jijel, Algeria.

Location

The map below shows the exact location of the plant in El-Milia, Jijel, Algeria:

Loading map...
  • Location: Bellara industrial zone, El-Milia, Jijel, Algeria
  • Coordinates (WGS 84): 36.753961, 6.244420 (exact)

Background

The Algerian Qatari Steel Jijel plant started operating in 2017 with DRI and EAF capacity.[1] In February 2022, representatives from Qatar and Algeria signed an MOU to study steel investments and expand capacity at the plant by 1800ttpa to 4mtpa.[2] This expansion is expected to start in 2025.[3]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Workforce size
Main plant Operating[4] 2013[5] 2015[5][6] 2017[7] 2400[8]
Expansion Announced[9] 2022-02[9] 2025[10] 1600[8]

Table 2: Ownership and Parent Company Information

Phase State-owned entity status Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Partial Industries Qatar QPSC [49.0%]; Groupe Industriel Sider SpA [46.0%]; other [5.0%] 4295886945 [49%]; 5000941519 [46%]; unknown [5%] E100001000008 [46%]; E100000000839 [32.9%]; E100000001753 [21.1%] Algerian Qatari Steel[11] 5076384326 E100001000957

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant semi-finished; finished rolled[11] wire rod, rebar, billets[11] DRI, EAF[12][10] 1 Midrex DRI plant (2.5 MTPA, began in 2019); 2 EAF[12][13][10]
Expansion semi-finished; finished rolled[11] wire rod, rebar, billets[11] DRI, EAF[9] EAF (# unknown), DRI (# unknown)[9]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 2200 TTPA[12][12] 2200 TTPA[12][12]
Expansion announced 1800 TTPA[9] 1800 TTPA[9]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 2500 TTPA[14][15] 2500 TTPA[14][15]
Expansion announced 2500 TTPA[10] 2500 TTPA[10]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20221114215719/https://thepeninsulaqatar.com/article/03/11/2022/inauguration-of-algerian-qatari-steel-affirms-amirs-algerian-presidents-interest-in-developing-investment-ties. Archived from the original on 2022-11-14. {{cite web}}: Missing or empty |title= (help)
  2. "H.E. Minister of Commerce and Industry and H.E. Algerian Minister of Trade and Export Promotion witness signing of MoU to study investment opportunities in steel industry – Ministry of Commerce and Industry". www.moci.gov.qa. Retrieved 2023-06-20.
  3. El Sayed, Mohamed (March 2023). "Algerian-Qatari Steel (AQS): At First Glance". Midrex. Retrieved 08/30/2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. https://web.archive.org/web/20210512141034/https://aqs.dz/news/. Archived from the original on 12 May 2021. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.zawya.com/en/projects/projects-algeria-to-launch-new-steel-production-unit-gltvh9d4. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20230321213602/https://www.idom.com/en/new/aqs-start-up-of-the-first-steel-melt-shop/. Archived from the original on 21 March 2023. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20221114215719/https://thepeninsulaqatar.com/article/03/11/2022/inauguration-of-algerian-qatari-steel-affirms-amirs-algerian-presidents-interest-in-developing-investment-ties. Archived from the original on 14 November 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20230209050346/https://aisusteel.org/en/14930/. Archived from the original on 09 February 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 https://www.moci.gov.qa/en/mec_news/h-e-minister-of-commerce-and-industry-and-h-e-algerian-minister-of-trade-and-export-promotion-witness-signing-of-mou-to-study-investment-opportunities-in-steel-industry/. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 https://web.archive.org/web/20230411213810/https://www.midrex.com/tech-article/algerian-qatari-steel-aqs-at-first-glance/. Archived from the original on 11 April 2023. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 https://web.archive.org/web/20240125044422/https://aqs.dz/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 https://web.archive.org/web/20220114001812/https://aqs.dz/about/. Archived from the original on 14 January 2022. {{cite web}}: Missing or empty |title= (help)
  13. https://web.archive.org/web/20220320173526/https://www.midrex.com/about-midrex/midrex-plants/. Archived from the original on 20 March 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://web.archive.org/web/20220516153425/https://www.idom.com/en/project/pmc-steel-algerian-qatari-steel-aqs-bellara-integral-steel-complex/. Archived from the original on 16 May 2022. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 (PDF) https://www.midrex.com/wp-content/uploads/Midrex-Plants-Sheet2022.pdf. {{cite web}}: Missing or empty |title= (help)

Resources