Aliağa Pig-Üçpınar Pig Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Aliağa Pig-Üçpınar Pig Gas Pipeline, also known as Botaş Aliağa pig-Üçpınar pig Natural Gas Loop Pipeline, is a gas pipeline in Turkey.[1]

Location

The pipeline runs in Turkey.

Loading map...

Project Details

  • Operator: Botaş[2]
  • Owner: Botaş[2]
  • Parent: Botaş[2]
  • Current capacity:
  • Length: 32 km[2]
  • Start Year: 2019[2]
  • Diameter: 36 inches[2]
  • Status: Operating
  • Associated Projects:

Background

Articles and resources

References

  1. Botas. "Ongoing Projects". Botas.gov. Retrieved August 21, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 ACD Construction Trade Co.Lti. "COMPLETED PROJECTS | İzmir - Aliağa". acdinsaat.com. Retrieved August 22, 2020.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles