Alistrate-Petroto solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Alistrate-Petroto solar farm (Αλιστρατη-Πετρωτο) is a solar photovoltaic (PV) farm in pre-construction in Serres Regional Unit, Central Macedonia, Greece.

Project Details

Table 1: Phase-level project details for Alistrate-Petroto solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 55.9 MWp/dc[1] PV[1] Idea Phos 2 LLC (Light Idea 2 LLC) [100%] (Ιδεα_Φως_2_Μονοπροσωπη Α.Ε.)[2]
2 Pre-construction[1] 26.6 MWp/dc[1] PV[1] Idea Phos 2 LLC (Light Idea 2 LLC) [100%] (Ιδεα_Φως_2_Μονοπροσωπη Α.Ε.)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Alistrate-Petroto solar farm

Phase Name Location Coordinates (WGS 84)
1 Serres Regional Unit, Central Macedonia, Greece[1] 41.0327, 23.9871 (exact)[1]
2 Serres Regional Unit, Central Macedonia, Greece[1] 41.0397, 24.0057 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240301134205/https://geo.rae.gr/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)