Alistrate solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Alistrate solar farm (Αλιστρατη -Σπηλαιο, Αλιστρατη) is a solar photovoltaic (PV) farm in pre-construction in Serres Regional Unit, Central Macedonia, Greece.

Project Details

Table 1: Phase-level project details for Alistrate solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 35 MWp/dc[1] PV[1] Cantreva Renewable Energy Sources LLC [100%] (Cantreva Ανανεωσιμες Πηγες Ενεργειας Ανωνυμη Εταιρεια)[2]
Spelaio Pre-construction[1] 40 MWp/dc[1] PV[1] Cantreva Renewable Energy Sources LLC [100%] (Cantreva Ανανεωσιμες Πηγες Ενεργειας Ανωνυμη Εταιρεια)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Alistrate solar farm

Phase Name Location Coordinates (WGS 84)
1 Serres Regional Unit, Central Macedonia, Greece[1] 41.0667, 23.9288 (exact)[1]
Spelaio Serres Regional Unit, Central Macedonia, Greece[1] 41.0297, 23.9806 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240301134205/https://geo.rae.gr/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)