Alkhazurovo-Shatoi Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Alkhazurovo-Shatoi Gas Pipeline (Russian: Газопровод-отвод Алхазурово - ГРС «Шатой») is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Alkhazurovo, Chechen Republic to Shatoi, Chechen Republic, Russia.
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.175 bcm/year[2]
- Length: 28.5 km[2]
- Diameter: 300 mm[2]
- Status: Proposed[1]
- Start year: 2024[2]
- Cost: RUB 194,7 million[3]
- Financing:
- Associated infrastructure:
Background
The Alkhazurovo-Shatoi Gas Pipeline, which is a distribution pipeline, was included in the gasification program of Gazprom for 2021-2025 for the Chechen Republic.[1] As of July 2023, there have not been any updates about the project.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "Программа газификации 2021–2025 в Чеченской Республике". Gazprommap.ru. 2022. Retrieved Jul 28, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 2.3 "Правительства Чеченской республики" (PDF). Retrieved 2022-08-09.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Информация об инвестиционной программе ООО "Газпром трансгаз Грозный" на 2019 год". Gazprom. January 18, 2019. Retrieved July 31, 2023.
{{cite web}}
: CS1 maint: url-status (link)