Alta Mesa wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: AM Wind Repower (Phase RP-2022)
Alta Mesa wind farm is a wind farm under construction in Riverside County, California, United States.
Project Details
Table 1: Phase-level project details for Alta Mesa wind farm
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1&2 | Retired[1] | 1988[2] | 2021[1] | 19 MW[2] | Onshore[2] | Brookfield Renewable Partners LP [100%][3] | AES[4] |
4 | Cancelled[1] | – | – | 40 MW[1] | Onshore[1] | – | – |
RP-2022 | Construction[1] | – | – | 39 MW[5] | Onshore[2] | Brookfield Renewable Partners LP [100%][6] | Brookfield Renewable Partners[6] |
Location
Table 2: Phase-level location details for Alta Mesa wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1&2 | Riverside County, California, United States[2] | 33.9384, -116.659 (exact)[2] |
4 | Riverside County, California, United States[1] | 33.9464, -116.663 (exact)[1] |
RP-2022 | Riverside County, California, United States[2] | 33.9384, -116.659 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://doi.org/10.5066/F7TX3DN0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131090733/https://files.ceqanet.opr.ca.gov/266816-2/attachment/Ys7wOQm-xFB5BCHQeTgwElj92Ibf3RCtR8iPBlvwcclcoG-IQnh9nHcPrrQ8tUMLCCT4pU-TyIW9QvFB0. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131001431/https://www.thewindpower.net/windfarm_en_2850.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125174310/https://altamesarepower.brookfieldusprojects.com/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20211106010943/https://planning.rctlma.org/Portals/14/Postings/AltaMesa/WCS00071R10_Alta_Mesa_EA-IS_Draft_for_Public_Release_to_RivCo.pdf. Archived from the original (PDF) on 06 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)