Alta Mesa wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: AM Wind Repower (Phase RP-2022)

Alta Mesa wind farm is a wind farm under construction in Riverside County, California, United States.

Project Details

Table 1: Phase-level project details for Alta Mesa wind farm

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1&2 Retired[1] 1988[2] 2021[1] 19 MW[2] Onshore[2] Brookfield Renewable Partners LP [100%][3] AES[4]
4 Cancelled[1] 40 MW[1] Onshore[1]
RP-2022 Construction[1] 39 MW[5] Onshore[2] Brookfield Renewable Partners LP [100%][6] Brookfield Renewable Partners[6]

Location

Table 2: Phase-level location details for Alta Mesa wind farm

Phase Name Location Coordinates (WGS 84)
1&2 Riverside County, California, United States[2] 33.9384, -116.659 (exact)[2]
4 Riverside County, California, United States[1] 33.9464, -116.663 (exact)[1]
RP-2022 Riverside County, California, United States[2] 33.9384, -116.659 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131090733/https://files.ceqanet.opr.ca.gov/266816-2/attachment/Ys7wOQm-xFB5BCHQeTgwElj92Ibf3RCtR8iPBlvwcclcoG-IQnh9nHcPrrQ8tUMLCCT4pU-TyIW9QvFB0. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131001431/https://www.thewindpower.net/windfarm_en_2850.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125174310/https://altamesarepower.brookfieldusprojects.com/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20211106010943/https://planning.rctlma.org/Portals/14/Postings/AltaMesa/WCS00071R10_Alta_Mesa_EA-IS_Draft_for_Public_Release_to_RivCo.pdf. Archived from the original (PDF) on 06 November 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)