Alto Jequitibá Consorcio Cemig Sim Gd 2 solar project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Alto Jequitibá Consorcio Cemig Sim Gd 2 solar project is an operating solar photovoltaic (PV) farm in Alto Jequitibá, Minas Gerais, Brazil.
Project Details
Table 1: Phase-level project details for Alto Jequitibá Consorcio Cemig Sim Gd 2 solar project
Phase name | Status | Commissioning year | Nameplate capacity | Technology |
---|---|---|---|---|
1 | Operating[1] | 2023[1] | 2.5 MW[1] | PV[1] |
2 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[1] |
3 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[1] |
4 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Alto Jequitibá Consorcio Cemig Sim Gd 2 solar project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Alto Jequitibá, Minas Gerais, Brazil[1] | -20.4236, -41.9661 (approximate)[1] |
2 | Alto Jequitibá, Minas Gerais, Brazil[1] | -20.4236, -41.9661 (approximate)[1] |
3 | Alto Jequitibá, Minas Gerais, Brazil[1] | -20.4236, -41.9661 (approximate)[1] |
4 | Alto Jequitibá, Minas Gerais, Brazil[1] | -20.4236, -41.9661 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References