Aluminium Bahrain (ALBA) power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Aluminium Bahrain (ALBA) power station (محطة ألبا لإنتاج الكهرباء) is an operating power station of at least 3245-megawatts (MW) in Mazrowiah, Southern, Bahrain with multiple units, some of which are not currently operating. It is also known as ALBA Power Station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Aluminium Bahrain (ALBA) power station | Mazrowiah, Southern, Bahrain | 26.092532, 50.597067 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 3-1, 3-2, 4, 5-1, 5-2, 5-3, 5-4: 26.092532, 50.597067
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
3-1 | Operating[4][5] | fossil gas: natural gas[6][4] | 397[7] | combined cycle[8] | not found | 1992[9] |
3-2 | Operating[4][5] | fossil gas: natural gas[6][4] | 397[7] | combined cycle[8] | not found | 1992[9] |
4 | Operating[4][5] | fossil gas: natural gas[6][4] | 660[10] | combined cycle[11] | not found | 2005[11] |
5-1 | Operating[12][5][13][14] | fossil gas: natural gas[6][4][15] | 597.3[12][16] | combined cycle[15] | not found | 2019[13][14] |
5-2 | Operating[12][5][13][14] | fossil gas: natural gas[6][4][15] | 597.3[12][16] | combined cycle[15] | not found | 2019[13][14] |
5-3 | Operating[12][5][13][14] | fossil gas: natural gas[6][4][15] | 597.3[12][16] | combined cycle[15] | not found | 2019[13][14] |
5-4 | Construction[17][18][19] | fossil gas: natural gas[20][17] | 681[21][22][20] | combined cycle[17] | not found | 2024 (planned)[23][17][24] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
3-1 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
3-2 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
4 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
5-1 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
5-2 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
5-3 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
5-4 | Aluminium Bahrain[25][26][27] | Aluminium Bahrain BSC [100%][28] | Aluminium Bahrain BSC [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): power[29][30]
- Captive industry: Aluminum[29][30]
- Non-industry use: power[29][30]
Articles and Resources
References
- ↑ https://web.archive.org/web/20211017033132/https://www.albasmelter.com/Contact/Pages/default.aspx. Archived from the original on 17 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210813155839/https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18638-alba-3ab-gas-power-plant. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210813171448/https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18639-alba-4ab-gas-power-plant. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 https://web.archive.org/web/20211017032005/https://www.albasmelter.com/Range/OProducts/Pages/Power.aspx. Archived from the original on 17 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20221006175919/https://www.albasmelter.com/About%20Alba/Factsfigures/Pages/default.aspx. Archived from the original on 06 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20220709112509/https://www.alayam.com/alayam/economic/926828/News.html. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20210813155521/https://www.nexi.go.jp/environment/info/pdf/eia_17-042_04.pdf. Archived from the original (PDF) on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210813160101/https://www.alstom.com/press-releases-news/2005/11/ALSTOM-wins-gas-turbine-upgrade-order-for-Alba-Power-Plant-Bahrain-20051118. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240329053955/https://www.power-technology.com/data-insights/power-plant-profile-aluminium-bahrain-alba-power-station-iii-bahrain/. Archived from the original on 29 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210813155629/https://www.albawaba.com/business/bahrain-second-gas-turbine-delivered-alba%E2%80%99s-new-660-mw-power-station-4. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20210813171330/https://www.albawaba.com/business/alba-completes-first-major-foundation-line-5-expansion. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 https://web.archive.org/web/20211210103455/https://www.albasmelter.com/mc/News/Pages/2018/Alba-Power-Expansion-Project-achieves-First-Fire-Milestone.aspx. Archived from the original on 10 December 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 13.5 https://web.archive.org/web/20210813172315/https://www.zawya.com/mena/en/press-releases/story/Alba_line_6_performs_above_expectations-ZAWYA20191229114625/. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 https://web.archive.org/web/20220617202426/https://www.albasmelter.com/About%20Alba/Pages/Line6.aspx. Archived from the original on 17 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 15.5 https://web.archive.org/web/20171218002330/https://www.esbinternational.ie/our-solutions/case-studies/2016/09/14/aluminium-bahrain-alba-pot-line-6-expansion-power-station-5. Archived from the original on 18 December 2017.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 https://web.archive.org/web/20220930153956/https://www.ge.com/gas-power/resources/case-studies/alba-signs-multiyear-agreement. Archived from the original on 30 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 https://web.archive.org/web/20220517061203/https://www.alcircle.com/news/alba-inks-agreement-with-mitsubishi-power-and-sepco-iii-to-construct-block-4-at-power-station-5-80444. Archived from the original on 17 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221114133639/https://www.zawya.com/ar/%D8%A7%D9%84%D8%A8%D9%8A%D8%A7%D9%86%D8%A7%D8%AA-%D8%A7%D9%84%D8%B5%D8%AD%D9%81%D9%8A%D8%A9/%D8%A8%D9%8A%D8%A7%D9%86%D8%A7%D8%AA-%D8%A7%D9%84%D8%B4%D8%B1%D9%83%D8%A7%D8%AA/%D8%A7%D9%84%D8%A8%D8%A7-%D8%AA%D8%B9%D9%84%D9%86-%D8%B9%D9%86-%D8%A7%D9%84%D8%A5%D8%BA%D9%84%D8%A7%D9%82-%D8%A7%D9%84%D9%86%D8%A7%D8%AC%D8%AD-%D9%84%D8%AA%D9%85%D9%88%D9%8A%D9%84-%D9%85%D8%B4%D8%B1%D9%88%D8%B9-%D9%85%D8%AC%D9%85%D8%B9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B1%D8%A7%D8%A8%D8%B9-%D8%A8%D9%85%D8%AD%D8%B7%D8%A9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%AE%D8%A7%D9%85%D8%B3%D8%A9-jqd7q9o2. Archived from the original on 14 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230323202352/https://www.zawya.com/en/projects/utilities/albas-ps-5-block-4-project-on-track-for-2024-handover-in-bahrain-op656adp. Archived from the original on 23 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 https://www.alayam.com/online/Economy/961407/News.html?utm_campaign=magnet&utm_source=article_page&utm_medium=related_articles.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230322221821/https://www.tradearabia.com/news/IND_407639.html. Archived from the original on 22 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220626105305/https://www.albasmelter.com/en/category/power-station-5-block-4-expansion-project. Archived from the original on 26 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240326030711/https://www.albasmelter.com/en/article/alba-signs-agreement-with-mitsubishi-power-and-sepco-iii-as-epc-contractor-for-block-4-in-power-station-5. Archived from the original on 26 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240326024034/https://www.gastopowerjournal.com/projectsafinance/item/13731-alba-power-station-5-expansion-on-track-to-be-completed-in-q4-2024. Archived from the original on 26 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 25.0 25.1 25.2 25.3 25.4 25.5 25.6 https://web.archive.org/web/20240326025232/https://www.albasmelter.com/en/category/annual-report. Archived from the original on 26 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 26.0 26.1 26.2 26.3 26.4 26.5 26.6 https://web.archive.org/web/20240326030818/https://bna.bh/.aspx?cms=q8FmFJgiscL2fwIzON1%252BDtyWNIyUzwrVcsDGsd1KlmU%253D. Archived from the original on 26 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 27.0 27.1 27.2 27.3 27.4 27.5 27.6 https://web.archive.org/web/20240326030841/http://www.alwasatnews.com/news/319778.html. Archived from the original on 26 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 28.0 28.1 28.2 28.3 28.4 28.5 28.6 https://web.archive.org/web/20220701144839/https://www.japantimes.co.jp/country-report/2019/06/26/global-insight/bahrain-report-2019/leading-world-aluminum/. Archived from the original on 01 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 29.0 29.1 29.2 https://web.archive.org/web/20220709111244/https://www.albasmelter.com/en/article/alba-chairman-visits-power-stations-3-and-5. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 30.0 30.1 30.2 https://web.archive.org/web/20240405072102/http://www.alwasatnews.com/news/878629.html. Archived from the original on 05 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.