Amador Aguiar II hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Amador Aguiar II hydroelectric plant (Usina Hidrelétrica Amador Aguiar II) is an operating hydroelectric power plant in Araguari, Região Geográfica Intermediária de Uberlândia, Minas Gerais, Brazil.
Project Details
Table 1: Project details for Amador Aguiar II hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 2007[1] | 210 MW[1] | 3 x 70 MW[2] | Conventional storage[2] | Aliança Energia [87.4%]; Votorantim [12.6%][1][3][4][5][6] | Consórcio Capim Branco Energia (CCBE)[1][7] |
Location
Table 2: Location details for Amador Aguiar II hydroelectric plant
Location | River | Complex | Coordinates (WGS 84) |
---|---|---|---|
Araguari, Região Geográfica Intermediária de Uberlândia, Minas Gerais, Brazil[1] | Rio Araguari[1] | Complexo Energético Amador Aguiar[8] | -18.6592, -48.4368 (exact)[1] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Agência Nacional de Energia Elétrica (April 4, 2023). "Matriz Elétrica Brasileira". Agência Nacional de Energia Elétrica. Retrieved April 4, 2023.
- ↑ 2.0 2.1 https://web.archive.org/web/20220625012602/https://www.ccbe.com.br/uhe-amador-aguiar-i/. Archived from the original on 25 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220626041324/https://aliancaenergia.com.br/br/parque-gerador/. Archived from the original on 26 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221230121707/https://www.venergia.com.br/usinas-e-parques/. Archived from the original on 30 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220630181620/https://aliancaenergia.com.br/br/uhe-amador-aguiar-i-completa-16-anos-de-operacao/. Archived from the original on 30 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220630181652/https://sec.report/Document/0001292814-22-001004/. Archived from the original on 30 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220625055656/https://www.ccbe.com.br/quem-somos/. Archived from the original on 25 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220625055656/https://www.ccbe.com.br/quem-somos/. Archived from the original on 25 June 2022.
{{cite web}}
: Missing or empty|title=
(help)