Amalgamated Yekona I and II Coal Mines
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Amalgamated Yekona I and II Coal Mines is an operating coal mine in Warora, Chandrapur, Maharashtra, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Amalgamated Yekona I and II Coal Mines | Warora, Chandrapur, Maharashtra, India | 20.228333, 78.9166666 (approximate) |
The map below shows the approximate location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | 2021 | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
2[1] | 2.75[2] | 2022[2] | Surface | Open Pit | 17 | 50* | 628* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
58 | – | – | Wardha Valley | Lignite | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Western Coalfields Ltd[3] | Coal India Ltd [100.0%] | India |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | – | – | – | 2[4] | 2[5] | 2[5] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Amalgamated Yekona I and II Opencast Coal Mine is a 3.44 million tonne-per-annum mine owned by Western Coalfields Limited, a subsidiary of Coal India Limited. The proposed mining area is the Northern extension of Western limit of Wardha Valley Coalfield and located adjacent to Yekona village which falls in Warora Tahsil of Chandrapur District of Maharashtra State, India. Total area required for the project is 1701.32 Ha. Out of this about 254.15 Ha is acquired for Yekona I OC and 421.70 Ha is acquired for Yekona-II OC. Total 675.85 Ha land is acquired and additional 1025.47 Ha land will be acquired for proposed project. 208 households of Marda village, as per 2011 Census, are to be resettled and rehabilitated as per the R&R policy of Coal India.[6]
Yekona-I opencast coal mine project was granted environment clearance (EC) for production capacity of 0.40 MTPA in a lease area of 265.50 ha on 17 October, 2006. Yekona-II opencast coalmine project was also granted EC for production capacity of 0.60 MTPA in a lease area of 414.56 ha on 17 October 2006. However, the Amalgamated Yekona I and II OCP is yet to receive EC from MoEF&CC. The Public Hearing for the Amalgamated Yekona I & II OC mine (production capacity of 3.44 MTPA (Peak) within area of 1701.32 ha) was conducted successfully by Maharashtra Pollution Control Board at the project site in Warora Tehsil, Chandrapur on 14th June, 2019.[7]
Expansion Details
- Status:
- Size of Expansion:
- Permits and Applications:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) http://www.westerncoal.in/images/yekona-I-II%20OC.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 http://www.cspm.gov.in/ocmstemp/PROJ_SUMMARY?prcd=N06000132&stat=O.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240723001427/http://www.westerncoal.in/images/grade_2021_22.pdf. Archived from the original (PDF) on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://coal.nic.in/sites/default/files/2023-05/srn-march-2023_0.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240613224926/https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf. Archived from the original (PDF) on 13 June 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Executive Summary of the Environment Impact Assessment and Environment Management Plan, Central Mine Planning and Design Institute, 6 June, 2016
- ↑ Environment Impact Assessment and Environment Management Plan, Central Mine Planning and Design Institute, 6 June, 2016