Amazon Zaratan solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Amazon Zaratan solar farm is an announced solar photovoltaic (PV) farm in Valladolid, Castile and León, Spain.

Project Details

Table 1: Phase-level project details for Amazon Zaratan solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Announced[1] 2025 (planned)[2] 20.1 MW[3] PV[4] Amazon [100%][3] Amazon[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Amazon Zaratan solar farm

Location Coordinates (WGS 84)
Valladolid, Castile and León, Spain[3] 41.6467, -4.8229 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.pv-magazine.es/2023/01/31/amazon-anuncia-dos-nuevas-plantas-fotovoltaicas-y-un-techo-solar-en-espana/ https://sustainability.aboutamazon.com/around-the-globe?energyType=Solar+farm, https://www.pv-magazine.es/2023/01/31/amazon-anuncia-dos-nuevas-plantas-fotovoltaicas-y-un-techo-solar-en-espana/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://energycentral.com/news/zaratan-29-mwp-solar-farm. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 "Sustainability: Our Global Renewable Energy Projects". Amazon. Archived from the original on 2024-02-01. Retrieved 2024-03-04.
  4. https://web.archive.org/web/20240207132153/https://www.pv-magazine.es/2023/01/31/amazon-anuncia-dos-nuevas-plantas-fotovoltaicas-y-un-techo-solar-en-espana/. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)