Amera Coal Mine is a proposed coal mine in Amera, Surguja, Chhattisgarh, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Amera Coal Mine Amera, Surguja, Chhattisgarh, India 23.065899, 83.049535 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed[1] Announced New 2025 (planned)[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
1[1] Surface Open Pit 6.68 50* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
22.42 Lakhanpur Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
South Eastern Coalfields Ltd Coal India Ltd [100.0%] India

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background on Mine

The Amera Opencast Coal Mine Project is sited on a mining lease area of 668.184 ha. The project received its environment clearance for a capacity of 1 million tonnes per annum on 22 February 2005.[2]

The mine proposed an expansion in 2015 but there have been no public statements regarding those developments and it was likely shelved and now cancelled.

According to SECL's annual report in 2022, Project is delayed due to delay in possession of land. Villagers resisting in disbursement of land compensation. 38% disbursement of compensation has been completed. The Project is likely to be completed in 2025-26.[3]

Expansion Details

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://d3u7ubx0okog7j.cloudfront.net/documents/SECL_Annual_Report_2022-23.pdf. {{cite web}}: Missing or empty |title= (help)
  2. Form 1 for Environment Clearance for Expansion of Amera Opencast Coal Mine Project from 1.0 MTPA to 2.0 MTPA, CPMDI, April 2015
  3. SECL Annual Report 2022-2023, South Eastern Coalfields Limited