Amydaio solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Amydaio solar farm (Αμυνταιο 2) is a solar photovoltaic (PV) farm under construction in Florina Regional Unit, Western Macedonia, Greece.
Project Details
Table 1: Phase-level project details for Amydaio solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
2 | Construction[1][2] | 2024 (planned)[1] | 104.9 MWp/dc[2] | PV[2] | Meton Energy [100%] (ΜΕΤΩΝ Ενεργειακή)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Amydaio solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Florina Regional Unit, Western Macedonia, Greece[2] | 40.6144, 21.6665 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240509013014/https://www.powergame.gr/green-power/537696/mytilineos-kataskevi-8-fotovoltaikon-gia-ti-meton-energeiaki/. Archived from the original on 09 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240301134205/https://geo.rae.gr/.
{{cite web}}
: Missing or empty|title=
(help)