Anémide wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Compostilla Node

Anémide wind farm is a cancelled wind farm in Spain.

Project Details

Table 1: Phase-level project details for Anémide wind farm

Status Nameplate capacity Type Owner Operator
Cancelled[1] 80 MW[2] Onshore[2] Capital Energy [100%][2] Capital Energy[2]

Location

Table 2: Phase-level location details for Anémide wind farm

Location Coordinates (WGS 84)
Spain[2] 42.5624, -6.6033 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240423170545/https://elbierzo.eldiario.es/cabrera/desestiman-macroparques-eolicos-solicito-green-energy-capital-cabrera_1_10520077.html. Archived from the original on 23 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240126042111/https://www.elespanol.com/castilla-y-leon/economia/empresas/20220608/capital-energy-creara-empleos-leon-inversion-millones/678682222_0.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)