Anémide wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Compostilla Node
Anémide wind farm is a cancelled wind farm in Spain.
Project Details
Table 1: Phase-level project details for Anémide wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Cancelled[1] | 80 MW[2] | Onshore[2] | Capital Energy [100%][2] | Capital Energy[2] |
Location
Table 2: Phase-level location details for Anémide wind farm
Location | Coordinates (WGS 84) |
---|---|
Spain[2] | 42.5624, -6.6033 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240423170545/https://elbierzo.eldiario.es/cabrera/desestiman-macroparques-eolicos-solicito-green-energy-capital-cabrera_1_10520077.html. Archived from the original on 23 April 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240126042111/https://www.elespanol.com/castilla-y-leon/economia/empresas/20220608/capital-energy-creara-empleos-leon-inversion-millones/678682222_0.html. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)