Anchois Phase 1 Gas Field (Morocco)
From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project. |
Related categories: |
Anchois Phase 1 Gas Field is a discovered gas field in Morocco.
Anchois Phase 1 is a part of the Anchois complex.
Project Details
Main Data
Table 1: Field-level project details for Anchois Phase 1 Gas Field
Unit name | Status | Operator | Owner | Discovery year | FID* year | Production start year |
---|---|---|---|---|---|---|
Anchois Phase 1 | Discovered[1][2] | Energean[3] | Chariot Energy (30.0%); ONHYM (25.0%); Energean (45.0%)[4] | 2009[1] | 2024 (expected)[5][6] | 2027 (expected)[1] |
Production and Reserves
Table 2: Reserves of Anchois Phase 1 Gas Field
Fuel Description | Reserve Classification | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|
gas | remaining recoverable resource | 39388.36 | million m³ | 2022 | [7] |
Table 3: Production from Anchois Phase 1 Gas Field
Category | Fuel Description | Quantity | Units | Data Year | Source |
---|---|---|---|---|---|
production design capacity | gas | 413.42 | million m³/y | 2025 | [1] |
Location
Table 4: field-level location details for Anchois Phase 1 Gas Field
Location | Coordinates (WGS 84) |
---|---|
Offshore, Morocco[1] | 35.1801, -6.3636 (approximate)[1] |
The map below shows the approximate location of the field(s) within the Anchois complex:
Articles and Resources
Additional data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20230324184849/https://www.spglobal.com/commodityinsights/en/ci/research-analysis/moroccos-anchois-discovery.html. Archived from the original on 24 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240205204323/https://www.upstreamonline.com/field-development/north-african-gas-project-passes-key-milestone-for-go-ahead/2-1-1589842?zephr_sso_ott=g89ePN. Archived from the original on 05 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115033727/https://www.africa-energy.com/news-centre/article/energean-takes-operatorship-moroccos-anchois-gas-project. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230308121653/https://www.chariotenergygroup.com/operations/transitional-gas/. Archived from the original on 08 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115031356/https://www.offshore-mag.com/regional-reports/africa/article/14302422/energean-joins-chariot-in-offshore-morocco-anchois-gas-project. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240115031448/https://www.offshore-technology.com/data-insights/oil-gas-field-profile-anchois-tanger-larache-conventional-gas-field-morocco/. Archived from the original on 15 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220813011150/https://www.chariotenergygroup.com/wp-content/uploads/2022/07/Material-Increase-in-Gas-Resources_20.07.22-Final.pdf. Archived from the original (PDF) on 13 August 2022.
{{cite web}}
: Missing or empty|title=
(help)