Anemus wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Anemus wind farm (Complexo Eólico Anemus) is an operating wind farm in Currais Novos , Rio Grande do Norte, Brazil.
Project Details
Table 1: Phase-level project details for Anemus wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 37.8 MW[1] | Onshore[2] | 2W Energia [100%][3] | 2W Energia[4] |
2 | Operating[1] | 2023[1] | 46.2 MW[1] | Onshore[2] | 2W Energia [100%][3] | 2W Energia[4] |
3 | Operating[1] | 2023[5] | 54.6 MW[1] | Onshore[2] | 2W Energia [100%][3] | 2W Energia[4] |
Location
Table 2: Phase-level location details for Anemus wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Currais Novos , Rio Grande do Norte, Brazil[1] | -6.2627, -36.5173 (exact)[1] |
2 | Currais Novos , Rio Grande do Norte, Brazil[1] | -6.2627, -36.5173 (exact)[1] |
3 | Currais Novos , Rio Grande do Norte, Brazil[1] | -6.2627, -36.5173 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 Agência Nacional de Energia Elétrica - ANEEL (2024-02-10). "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. Retrieved 2024-09-18.
{{cite web}}
: Check|archive-url=
value (help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240131084119/https://www.canalenergia.com.br/noticias/53184891/2w-energia-inicia-construcao-do-complexo-eolico-anemus. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240130222516/https://clickpetroleoegas.com.br/construcao-de-novo-complexo-eolico-e-iniciada-no-rio-grande-do-norte-empreendimento-tera-capacidade-de-1386-mw/. Archived from the original on 2024-01-30.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.weg.net/institutional/US/en/news/products-and-solutions/weg-announces-agreement-with-2w-ecobank-for-self-production-of-wind-power.
{{cite web}}
: Missing or empty|title=
(help)