Anshan Baode Iron & Steel Co., Ltd. (鞍山宝得钢铁有限公司) is a 1800 thousand tonnes per annum (TTPA) blast furnace (BF) and basic oxygen furnace (BOF) steel plant operating in Anshan, Liaoning, China.
Location
The map below shows the location of the steel plant in Anshan, Liaoning, China.
- Location: Chengang Street, Tiexi District, Anshan City, Liaoning Province[1]
- Coordinates (WGS 84): 41.173613, 122.945501 (exact)
Background
The company was fined 18,000 RMB for failing to place conspicuous safety warning signs in the larger hazardous area.[2]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
operating[1] | 1980[3] | 2220[1] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Owner | Owner company PermID |
---|---|---|---|
Anshan Baode Iron & Steel Co., Ltd. [100%][1] | GEM0000007 [100%] | Anshan Baode Iron & Steel Co., Ltd.[1] | GEM0000007 |
Table 3: Process and Products
Steel product category | Steel products | ISO 14001 | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
finished rolled[4] | hot rolled groove and angle steel, H-beam steel, I-beam steel[4] | yes[5] | yes[5] | blast furnace (BF) and basic oxygen furnace (BOF)[6] | 1 BOF (120-tonne)[6] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum):
Basic oxygen furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|
1800 TTPA[7] | 1800 TTPA |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum):
Blast furnace capacity | Nominal iron capacity (total) |
---|---|
1150 TTPA[8] | 1150 TTPA |
Blast Furnace Details
Table 6: Blast Furnace Details:
Unit name | Status | Start date | Current size | Current capacity |
---|---|---|---|---|
unknown | operating[9] | 2019[9] | 1250 m³[6] | 1150 TTPA[8] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.qcc.com/firm/a1160085c7b2cbd90e500de907d5431f.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "鞍山宝得钢铁有限公司安全生产警示标志类违法行政处罚案". 鞍山市应急管理局. 2023-04-11.
- ↑ https://web.archive.org/web/20220113230937/https://baike.baidu.com/item/%E9%9E%8D%E5%B1%B1%E5%AE%9D%E5%BE%97%E9%92%A2%E9%93%81%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8. Archived from the original on 2022-01-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20190911042950/http://www.baode.com.cn:80/products/. Archived from the original on 2019-09-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20211020130136/http://www.baode.com.cn/products/index.php?aid=14. Archived from the original on 2021-10-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 2022-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220119134817/http://www.baode.com.cn/about/index.php?aid. Archived from the original on 2022-01-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210713111000/http://www.ral.neu.edu.cn/2017/0325/c4415a86505/pagem.htm. Archived from the original on 2021-07-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://factory.mysteel.com/19/1112/16/6D8C8690E3042F91.html.
{{cite web}}
: Missing or empty|title=
(help)