Antrim wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Antrim wind farm is an operating wind farm in Hillsborough County, New Hampshire, United States.

Project Details

Table 1: Phase-level project details for Antrim wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2019[1] 29 MW[1] Onshore[1] TransAlta Corp [100%][2] TransAlta[3]

Location

Table 2: Phase-level location details for Antrim wind farm

Phase Name Location Coordinates (WGS 84)
1 Hillsborough County, New Hampshire, United States[4] 43.0566, -72.0195 (exact)[4]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240131090730/https://energynews.us/2020/12/07/in-new-hampshire-time-hasnt-healed-rift-over-wind-turbines-in-wildlife-area/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131001706/https://www.thewindpower.net/windfarm_en_30620.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)