Aquarii solar farm (Brazil)

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Ufv Aquarii Solar-3

Aquarii solar farm (Brazil) (Parque Solar Aquarii) is a solar photovoltaic (PV) farm in pre-construction in Brasilândia de Minas, Minas Gerais, Brazil.

Project Details

Table 1: Phase-level project details for Aquarii solar farm (Brazil)

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2024 (planned)[1] 190 MWp/dc[1] PV[1] Gerdau SA [50%]; Shell Energy Operations Pty Ltd [50%][1][1] Shell Energy Operations[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Aquarii solar farm (Brazil)

Location Coordinates (WGS 84)
Brasilândia de Minas, Minas Gerais, Brazil[3] -17.0102, -46.0084 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240201153132/https://www.shell.com.br/imprensa/comunicados-para-a-imprensa-2021/shell-brasil-e-gerdau-anunciam-futura-joint-venture-de-energia-solar-em-minas-gerais.html. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240206173430/https://renewablesnow.com/news/shell-gerdau-to-develop-190-mw-solar-project-in-brazil-748111/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240206222438/https://www.pv-magazine-latam.com/brasil-noticias/shell-e-gerdau-anunciam-mais-um-projeto-fotovoltaico-no-brasil-este-com-260-mwp/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)