Aragonne Wind Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Aragonne Mesa Phase II (Phase 2)
Aragonne Wind Project is an operating wind farm in Guadalupe County, New Mexico, United States.
Project Details
Table 1: Phase-level project details for Aragonne Wind Project
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1 | Retired[1] | 2006[2] | 2022[1] | 90 MW[2] | Onshore[2] | Leeward Energy [100%][3] | Infigen Energy[4] |
2 | Operating[5] | 2022[5] | – | 145 MW[3] | Onshore[6] | Leeward Energy [100%][3] | – |
RP1 | Operating[7] | 2022[7] | – | 90 MW[8] | Onshore[2] | Leeward Energy [100%][7] | – |
Location
Table 2: Phase-level location details for Aragonne Wind Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Guadalupe County, New Mexico, United States[6] | 34.8150, -105.0810 (exact)[6] |
2 | Guadalupe County, New Mexico, United States[9] | 34.8152, -105.0911 (exact)[9] |
RP1 | Guadalupe County, New Mexico, United States[6] | 34.8150, -105.0810 (exact)[6] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240126122638/https://nawindpower.com/leeward-concludes-construction-of-new-mexico-aragonne-wind-projects. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240125174320/https://www.ge.com/news/press-releases/ge-renewable-energy-announces-235-mw-repower-greenfield-expansion-for-leeward-aragonne-wind-project. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131001825/https://www.thewindpower.net/windfarm_en_3085.php. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 6.0 6.1 6.2 6.3 6.4 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20240126122848/https://www.leewardenergy.com/projects/aragonne-mesa-wind/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211022034215/https://www.renewableenergyworld.com/wind-power/leewards-235-mw-aragonne-wind-project-getting-an-upgrade/. Archived from the original on 22 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help)