Aragonne Wind Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Aragonne Mesa Phase II (Phase 2)

Aragonne Wind Project is an operating wind farm in Guadalupe County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Aragonne Wind Project

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1 Retired[1] 2006[2] 2022[1] 90 MW[2] Onshore[2] Leeward Energy [100%][3] Infigen Energy[4]
2 Operating[5] 2022[5] 145 MW[3] Onshore[6] Leeward Energy [100%][3]
RP1 Operating[7] 2022[7] 90 MW[8] Onshore[2] Leeward Energy [100%][7]

Location

Table 2: Phase-level location details for Aragonne Wind Project

Phase Name Location Coordinates (WGS 84)
1 Guadalupe County, New Mexico, United States[6] 34.815, -105.081 (exact)[6]
2 Guadalupe County, New Mexico, United States[9] 34.8152, -105.0911 (exact)[9]
RP1 Guadalupe County, New Mexico, United States[6] 34.815, -105.081 (exact)[6]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240126122638/https://nawindpower.com/leeward-concludes-construction-of-new-mexico-aragonne-wind-projects. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240125174320/https://www.ge.com/news/press-releases/ge-renewable-energy-announces-235-mw-repower-greenfield-expansion-for-leeward-aragonne-wind-project. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240131001825/https://www.thewindpower.net/windfarm_en_3085.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20240126122848/https://www.leewardenergy.com/projects/aragonne-mesa-wind/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20211022034215/https://www.renewableenergyworld.com/wind-power/leewards-235-mw-aragonne-wind-project-getting-an-upgrade/. Archived from the original on 22 October 2021. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)