Argent Colliery

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Argent Colliery is a cancelled coal mine in Mpumalanga, South Africa.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Argent Colliery Mpumalanga, South Africa -25.98333, 29.43333 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Cancelled[1] Announced[2] New[2]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
Surface[2] Open Pit[2] 50* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
25[3] 2023[3] 29[3] Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Puckree Group[2] Puckree Group [100%] South Africa

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Argent Colliery was a proposed opencast coal mine in Mpumalanga, South Africa.[4]

In 2019, it was reported that the mine was still awaiting approval for several mine use licenses in order to commence production.[5] As there have been no known public updates since then, the coal mine is presumed cancelled. Plans for the Argent Colliery were proposed by the South African coal-focused company, The Puckree Group, around 2014.[4]

The project's mine life was estimated to be 5 years.[4]

  • Operator: Puckree Group[4]
  • Owner: Puckree Group
  • Location: Mpumalanga, South Africa[4]
  • GPS Coordinates: -25.98333,29.43333 (approximate)[4]
  • Status: Cancelled
  • Production Capacity: 1.2 million tonnes per annum
  • Total Resource: 4.5 Mt
  • Mineable Reserves:
  • Coal Type:
  • Mine Size:
  • Mine Type: Surface[4]
  • Start Year:
  • Source of Financing:

Related GEM.wiki articles

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240718175111/https://www.africaoutlookmag.com/company-profiles/1203-puckree-group. Archived from the original on 18 July 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://www.puckree.co.za/project-pipeline/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 (PDF) https://www.glencore.com/.rest/api/v1/documents/static/a53e27b1-6025-4ef2-9be8-f3be543dfb26/GLENCORE-Resources-and-Reserves-report-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 Project Pipeline, Puckree Group, accessed December 2022
  5. "Puckree Group: Leaving the Right Legacy", Africa Outlook Magazine, 25 November 2019.