Arklow power station
From Global Energy Monitor
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Arklow power station is a power station in Arklow, Wicklow, Ireland with multiple units of varying statuses, none of which are currently operating. It is also known as Arklow Data Centre.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Arklow power station | Arklow, Wicklow, Ireland | 52.8119, -6.1313 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
DUB20 Phase 1 | Pre-construction[2][3][4][5] | fossil gas: natural gas, bioenergy: agricultural waste (biogas)[2][6] | 90[2] | ICCC[2] | 2024 (planned)[2] |
DUB20 Phase 2 | Announced[2][5] | fossil gas: natural gas[2][6] | 203[2][4] | ICCC[2] | 2027 (planned)[2] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
DUB20 Phase 1 | Echelon Data Centres Ltd[2] | Starwood Capital Operations LLC; unknown |
DUB20 Phase 2 | Echelon Data Centres Ltd[2] | Starwood Capital Operations LLC; unknown |
Articles and Resources
References
- ↑ https://web.archive.org/web/20240124231542/https://www.openstreetmap.org/search?whereami=1&query=52.8119%2C-6.1313#map=5/52.789/-6.152. Archived from the original on 24 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20240124231451/https://echelon-dc.com/dub20/. Archived from the original on 24 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.datacenterdynamics.com/en/news/echelon-frustrated-with-eirgrid-negotiation-over-planned-arklow-campus/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240219032740/https://www.irishtimes.com/business/2024/01/06/data-centre-group-echelon-frustrated-at-slow-pace-of-grid-connection/. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240219032841/https://bnnbreaking.com/finance-nav/business/triple-i-and-zayith-foods-a-dairy-revolution-in-nigeria. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20240124231442/https://www.datacenterdynamics.com/en/news/echelon-data-centres-to-make-biogas-at-county-wicklow-ireland-campus/. Archived from the original on 24 January 2024.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.