Arklow power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
This article is part of the Global Bioenergy Power Tracker, a Global Energy Monitor project. |
Arklow power station is a power station in Arklow, Wicklow, Ireland with multiple units of varying statuses, none of which are currently operating. It is also known as Arklow Data Centre, Arklow Dub20.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Arklow power station | Arklow, Wicklow, Ireland | 52.8119, -6.1313 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
DUB20 Phase 1 | Pre-construction[2][3][4][5] | bioenergy: agricultural waste (biogas), fossil gas: natural gas[2][6] | 90[2] | ICCC[2] | 2024 (planned)[2] |
DUB20 Phase 2 | Announced[2][5] | fossil gas: natural gas[2][6] | 203[2][4] | ICCC[2] | 2027 (planned)[2] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
DUB20 Phase 1 | Echelon Data Centres Ltd[2] | Starwood Capital Operations LLC; unknown |
DUB20 Phase 2 | Echelon Data Centres Ltd[2] | Starwood Capital Operations LLC; unknown |
Project-level captive use details
Articles and Resources
References
- ↑ "52.8119%2C-6.1313". OpenStreetMap. Archived from the original on 2024-01-24. Retrieved 2023-05-19.
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 "DUB20". Archived from the original on 2024-01-24. Retrieved 2023-05-19.
{{cite web}}
: Text "Echelon Data Centres" ignored (help); Text "Our Data Centres" ignored (help) - ↑ https://www.datacenterdynamics.com/en/news/echelon-frustrated-with-eirgrid-negotiation-over-planned-arklow-campus/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 "Data centre group Echelon 'frustrated' at slow pace of grid connection". The Irish Times. Archived from the original on 2024-02-19. Retrieved 2024-02-06.
- ↑ 5.0 5.1 "Grid Connection Delays Plague Echelon's DUB20 Data Center Project". 2024-01-08. Archived from the original on 2024-02-19. Retrieved 2024-02-06.
- ↑ 6.0 6.1 https://web.archive.org/web/20240124231442/https://www.datacenterdynamics.com/en/news/echelon-data-centres-to-make-biogas-at-county-wicklow-ireland-campus/. Archived from the original on 2024-01-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 "Echelon DUB20 Data Center in Dublin". www.datacentermap.com. Archived from the original on 2024-12-18. Retrieved 2024-12-16.
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Bioenergy Power Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.