Armadillo Solar Center

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Armadillo Solar Center is a cancelled solar photovoltaic (PV) farm in Corsicana, Navarro County, Texas, United States.

Project Details

Table 1: Phase-level project details for Armadillo Solar Center

Status Nameplate capacity Technology Owner Operator
Cancelled[1] 175 MWac[1] PV[1] Ørsted A/S [100%][2] Ørsted[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Armadillo Solar Center

Location Coordinates (WGS 84)
Corsicana, Navarro County, Texas, United States[1] 32.0001, -96.2027 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240206175144/https://armadillosolarcenter.com/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)