Armazém Gerais Morro da Pedra solar project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Armazém Gerais Morro da Pedra solar project is an operating solar photovoltaic (PV) farm in Lagoa da Confusão , Tocantins, Brazil.

Project Details

Table 1: Phase-level project details for Armazém Gerais Morro da Pedra solar project

Status Commissioning year Nameplate capacity Technology Owner
Operating[1] 2023[1] 1.1 MW[1] PV[2] GERAIS MORRO DA PEDRA LTDA (REG) [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Armazém Gerais Morro da Pedra solar project

Location Coordinates (WGS 84)
Lagoa da Confusão , Tocantins, Brazil[1] -10.7869, -49.6192 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 Agência Nacional de Energia Elétrica - ANEEL (2024-02-10). "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. Retrieved 2024-09-18. {{cite web}}: Check |archive-url= value (help)
  2. 2.0 2.1 "SIGA - Sistema de Informações de Geração da ANEEL". Agência Nacional de Energia Elétrica (ANEEL). 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-10.