Aroeira wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Aroeira wind farm (Complexo Eólico Aroeira) is a wind farm in pre-construction in Morro do Chapéu, Bahia, Brazil.
Project Details
Table 1: Phase-level project details for Aroeira wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2024 (planned)[2] | 47 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
10 | Pre-construction[1] | 2024 (planned)[2] | 26 MW[2] | Onshore[2] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
11 | Pre-construction[1] | 2024 (planned)[2] | 26 MW[2] | Onshore[2] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
2 | Construction[1] | 2024 (planned)[2] | 43 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
3 | Construction[1] | 2024 (planned)[2] | 43 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
4 | Construction[1] | 2024 (planned)[2] | 43 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
5 | Construction[1] | 2024 (planned)[2] | 43 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
6 | Construction[1] | 2024 (planned)[2] | 39 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
7 | Construction[1] | 2024 (planned)[2] | 47 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
8 | Construction[1] | 2024 (planned)[2] | 43 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
9 | Pre-construction[1] | 2024 (planned)[2] | 47 MW[2] | Onshore[1] | Enel Green Power Brasil Participações LTDA [100%][1][3] | Fazenda Aroeira Empreendimento de Energia[4][2] |
Location
Table 2: Phase-level location details for Aroeira wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
10 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
11 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
2 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
3 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
4 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
5 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
6 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
7 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
8 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
9 | Morro do Chapéu, Bahia, Brazil[1] | -12.5779, -38.0049 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 (PDF) https://web.archive.org/web/20240125162311/https://forcainvicta.com.br/wp-content/uploads/2021/06/doe_2021-06-10_completo.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 (PDF) https://web.archive.org/web/20240130223809/https://www.enelamericas.com/content/dam/enel-americas/en/investor/egp_merger/Significant%20event%20-%20Additional%20information%20Oct%2028.pdf. Archived from the original (PDF) on 30 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 https://web.archive.org/web/20240130222609/https://casadosdados.com.br/solucao/cnpj/fazenda-aroeira-empreendimento-de-energia-ltda-32282215000139. Archived from the original on 30 January 2024.
{{cite web}}
: Missing or empty|title=
(help)