Aroeira wind farm (Complexo Eólico Aroeira) is a wind farm in pre-construction in Morro do Chapéu, Bahia, Brazil.

Project Details

Table 1: Phase-level project details for Aroeira wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Construction[1] 2024 (planned)[2] 47 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
10 Pre-construction[1] 2024 (planned)[2] 26 MW[2] Onshore[2] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
11 Pre-construction[1] 2024 (planned)[2] 26 MW[2] Onshore[2] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
2 Construction[1] 2024 (planned)[2] 43 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
3 Construction[1] 2024 (planned)[2] 43 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
4 Construction[1] 2024 (planned)[2] 43 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
5 Construction[1] 2024 (planned)[2] 43 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
6 Construction[1] 2024 (planned)[2] 39 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
7 Construction[1] 2024 (planned)[2] 47 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
8 Construction[1] 2024 (planned)[2] 43 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]
9 Pre-construction[1] 2024 (planned)[2] 47 MW[2] Onshore[1] Enel Green Power Brasil Participações LTDA [100%][1][3] Fazenda Aroeira Empreendimento de Energia[4][2]

Location

Table 2: Phase-level location details for Aroeira wind farm

Phase Name Location Coordinates (WGS 84)
1 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
10 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
11 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
2 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
3 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
4 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
5 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
6 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
7 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
8 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]
9 Morro do Chapéu, Bahia, Brazil[1] -12.5779, -38.0049 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 (PDF) https://web.archive.org/web/20240125162311/https://forcainvicta.com.br/wp-content/uploads/2021/06/doe_2021-06-10_completo.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 (PDF) https://web.archive.org/web/20240130223809/https://www.enelamericas.com/content/dam/enel-americas/en/investor/egp_merger/Significant%20event%20-%20Additional%20information%20Oct%2028.pdf. Archived from the original (PDF) on 30 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 https://web.archive.org/web/20240130222609/https://casadosdados.com.br/solucao/cnpj/fazenda-aroeira-empreendimento-de-energia-ltda-32282215000139. Archived from the original on 30 January 2024. {{cite web}}: Missing or empty |title= (help)