Aroskraft-1 power station is an operating power station of at least 606-megawatts (MW) in Västerås, Västmanland, Sweden with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Aroskraft-1 power station | Västerås, Västmanland, Sweden | 59.58849, 16.513861 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 3, 4, 6, 7, Unit 1, Unit 2: 59.58849, 16.513861
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
3 | Operating[2] | fossil liquids: heavy fuel oil, coal: bituminous[2] | 250[3] | steam turbine[3] | yes[4] | 1970[5] | – |
4 | Operating[2] | bioenergy: wood & other biomass (solids), fossil liquids: heavy fuel oil[2][5] | 250[5] | steam turbine[5] | – | 1974[5] | – |
6 | Operating[6] | bioenergy: refuse (municipal and industrial wastes), bioenergy: wood & other biomass (solids)[6] | 51[6] | – | – | 2014[6] | – |
7 | Operating[7] | bioenergy: wood & other biomass (solids)[8] | 55[9] | – | – | 2019[7] | – |
Unit 1 | Retired | coal: bituminous | 75 | subcritical | – | 1963 | 2014 |
Unit 2 | Retired | coal: bituminous | 75 | subcritical | – | 1963 | 2014 |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
3 | Mälarenergi AB[10] | Mälarenergi AB |
4 | Mälarenergi AB[10] | Mälarenergi AB |
6 | Mälarenergi AB[10] | Mälarenergi AB |
7 | Mälarenergi AB[10] | Mälarenergi AB |
Unit 1 | Mälarenergi AB[10] | Mälarenergi AB |
Unit 2 | Mälarenergi AB[10] | Mälarenergi AB |
Background
Mälarenergi currently operates two biomass-fired CHP (combined heat and power) units at location of the former coal-fired power plant in Västmanland, Västmanland County, Sweden.[11]. Block 6 began operating in 2014[12], and Block 7 followed in 2019.[13]
Articles and Resources
References
- ↑ https://web.archive.org/web/20240125032405/https://www.openstreetmap.org/way/94792645. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240125032406/https://www.malarenergi.se/om-malarenergi/framtidens-samhalle/vara-anlaggningar/kraftvarmeverket-vasteras/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240125032220/https://www.osti.gov/etdeweb/servlets/purl/371282. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125032225/https://no.unionpedia.org/i/Aroskraft_kraftverk. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20240125032224/https://www.hembygd.se/industristaden/kraftvarmen-i-vasteras. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20230213125846/https://www.malarenergi.se/om-malarenergi/framtidens-samhalle/vara-anlaggningar/kraftvarmeverket-vasteras/block-6/. Archived from the original on 13 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://bioenergyinternational.com/malarenergi-supplies-first-biomass-power-to-grid-from-new-block-7-chp-unit/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230213130216/https://www.malarenergi.se/om-malarenergi/framtidens-samhalle/vara-anlaggningar/kraftvarmeverket-vasteras/block-7/. Archived from the original on 13 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220917194414/https://bioenergitidningen.se/wp-content/uploads/sites/2/2022/04/biokraftkartan2021web.pdf. Archived from the original (PDF) on 17 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 https://web.archive.org/web/20240125032219/https://www.wikiwand.com/no/Aroskraft_kraftverk. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.industryabout.com/country-territories-3/1570-sweden/fossil-fuels-energy/22863-aroskraft-coal-power-plant
- ↑ "Block 6 - en världsunik anläggning". Mälarenergi. Retrieved 2023-07-06.
- ↑ "Mälarenergi supplies first biomass-power to grid from new block 7 CHP unit". Bioenergy International. December 30, 2019.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Bioenergy Power Tracker, the Global Coal Plant Tracker, and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.