Arroyo Solar Energy Storage Hybrid
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Arroyo Solar Energy Storage Hybrid is a solar photovoltaic (PV) farm under construction in Pueblo Pintado, McKinley County, New Mexico, United States.
Project Details
Table 1: Phase-level project details for Arroyo Solar Energy Storage Hybrid
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2023 (planned)[1] | 300 MWac[1] | PV[1] | DE Shaw Renewable Investments (DESRI) [100%][2] | DE Shaw Renewable Investments (DESRI)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Arroyo Solar Energy Storage Hybrid
Location | Coordinates (WGS 84) |
---|---|
Pueblo Pintado, McKinley County, New Mexico, United States[1] | 35.9703, -107.5631 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240206175032/https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)