Arroyo Solar Energy Storage Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Arroyo Solar Energy Storage Hybrid is an operating solar photovoltaic (PV) farm in Pueblo Pintado, McKinley County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Arroyo Solar Energy Storage Hybrid

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2024[1] 300 MWac[1] PV[1] DE Shaw Renewable Investments (DESRI) [100%][2] DE Shaw Renewable Investments (DESRI)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Arroyo Solar Energy Storage Hybrid

Location Coordinates (WGS 84)
Pueblo Pintado, McKinley County, New Mexico, United States[1] 35.9703, -107.5631 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. 2.0 2.1 https://web.archive.org/web/20240206175032/https://www.energy-storage.news/new-mexicos-largest-solar-plus-storage-plant-in-utility-coal-retirement-plan-acquired-by-de-shaw/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)