Arun 4 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Arun 4 hydroelectric plant is a hydroelectric power plant in pre-construction in Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal.
Project Details
Table 1: Project details for Arun 4 hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Pre-construction[1] | 695 MW[1] | Conventional storage[2] | Nepal Electricity Authority (NEA)[2] |
Location
Table 2: Location details for Arun 4 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal[3] | Arun River[3] | 27.5833, 87.3042 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221204142029/https://www.hydropower-dams.com/news/india-and-nepal-agree-to-build-arun-iv/. Archived from the original on 04 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20220516105229/https://myrepublica.nagariknetwork.com/news/nea-bags-license-to-construct-490-2-mw-arun-4-hydropower-project/. Archived from the original on 16 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20221022144518/http://www.doed.gov.np/license/13. Archived from the original on 22 October 2022.
{{cite web}}
: Missing or empty|title=
(help)