Arun 4 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Arun 4 hydroelectric plant is a hydroelectric power plant in pre-construction in Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal.

Project Details

Table 1: Project details for Arun 4 hydroelectric plant

Status Nameplate capacity Technology type Owner
Pre-construction[1] 695 MW[1] Conventional storage[2] Nepal Electricity Authority (NEA)[2]

Location

Table 2: Location details for Arun 4 hydroelectric plant

Location River Coordinates (WGS 84)
Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal[3] Arun River[3] 27.5833, 87.3042 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20221204142029/https://www.hydropower-dams.com/news/india-and-nepal-agree-to-build-arun-iv/. Archived from the original on 04 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220516105229/https://myrepublica.nagariknetwork.com/news/nea-bags-license-to-construct-490-2-mw-arun-4-hydropower-project/. Archived from the original on 16 May 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20221022144518/http://www.doed.gov.np/license/13. Archived from the original on 22 October 2022. {{cite web}}: Missing or empty |title= (help)