Arun 4 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Arun IV

Arun 4 hydroelectric plant is an announced hydroelectric power plant in Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal.

Project Details

Table 1: Project details for Arun 4 hydroelectric plant

Status Nameplate capacity Technology type Owner
Announced[1] 490 MW[1] Conventional storage[2] Nepal Electricity Authority (NEA) [100%][2]

Location

Table 2: Location details for Arun 4 hydroelectric plant

Location River Coordinates (WGS 84)
Phungling municipality, Taplejung District, Kosi Zone, Province No. 1 Province, Nepal[1] Arun River[1] 27.5833, 87.3042 (approximate)[1]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221022144518/http://www.doed.gov.np/license/13. Archived from the original on 2022-10-22. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220516105229/https://myrepublica.nagariknetwork.com/news/nea-bags-license-to-construct-490-2-mw-arun-4-hydropower-project/. Archived from the original on 2022-05-16. {{cite web}}: Missing or empty |title= (help)