Ashikawa wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Ashigawa
Ashikawa wind farm (芦川ウインドファーム) is a wind farm under construction in Toyotomi, Hokkadio Prefecture, Japan.
Project Details
Table 1: Phase-level project details for Ashikawa wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Construction[1] | 2024 (planned)[2] | 129 MW[1] | Onshore[1] | Eurus Energy Holdings CORP [100%] (株式会社ユーラスエナジーホールディングス)[1][3] |
Location
Table 2: Phase-level location details for Ashikawa wind farm
Location | Coordinates (WGS 84) |
---|---|
Toyotomi, Hokkadio Prefecture, Japan[4] | 36.5748, 139.2394 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220221015856/https://www.eurus-energy.com/en/project/project-list/. Archived from the original on 21 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126160928/https://www.eurus-energy.com/en/project/project-jp/11183/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131105530/https://www.eurus-energy.com/en/aboutus/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240131183522/https://www.eurus-energy.com/project/project-jp/11163/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)